31 October, 2018

31-10-18

B63 - STH area view from South-West side
B63 - STH area view from North-East side
B63 - STH West side wall cladding erection activities
B63 - STH East side wall cladding erection activities
B63 - STH elevator at 14.00 m level civil work activities
B06 - Boiler Coal Bunker area view from North side
B01 - Boiler elevator structure wall cladding erection activities
WFGD area view from South-East side
WFGD area view from North side
L04 - WFGD Pump Bldg. area view from North-West side
L05 - WFGD Absorber Tower area view from North-East side
L05 - WFGD Absorber Tower elevator structure wall cladding erection activities
L06 - WFGD Electrical Bldg. area view from North-West side
L07 - WFGD Service Bldg. area view from West side
L07 - WFGD Service Bldg. gypsum storage area view
G11 - Boiler Fire Fighting Pump House area view from North-West side
G60 - Chemical Bulk Storage Bldg. area view from North-West side
D06 - Ash Transfer Tower area view from North-West side
E07 - Cooling Water Electrical Bldg. area view from North-West side
E04 - Cooling Tower area view from South-West side
Plant West side of Switchyard area road work activities
Plant East side of Ash Transfer Tower area civil work activities
Plant North Boiler Electrical Bldg. area civil work activities
Plant North side of Ash Loading area road work activities
Plant North side of Ash Loading area civil work activities
Plant East side of Ash Sub-Distribution Bldg. area gate installation activities
Plant North side of WFGD area gate installation activities
Plant South side of Boiler Coal Bunker area road work activities