05 December, 2016

05.12.16 HP1 Heater skidding

 HP1 Heater skidding
 HP2 Heater in position
 LP Lower casing
 STH Lev +14.00m View to North
 Condenser upper neck
Condenser hotwell skidding

02 December, 2016

02.12.16 HP1 Heater lift






02.12.16 Hotwell on foundation







02.12.16

 HP1 Heater Lifting
 Condenser hotwell skidding
  Condenser hotwell skidding
  Condenser hotwell skidding
 LP Turbine lower outer casing stored in STH loading bay
  LP Turbine lower outer casing & HP Turbine stored in STH loading bay
 HP Turbine stored in STH loading bay
 Boiler Furnace lifted in position 
 Boiler backpass
 Boiler backpass and furnace
 B35 BEB View to North
 ESP Steel erection
 ESP 1 hoppers installation
  ESP 1 hoppers installation
 B10 ID Fan Foundation South
 Stack Painting in progress
 WFGD Ductowork and duct 4 installed in position
 WFGD Absorber shell in progress
  WFGD Absorber shell in progress
 B10 ID Fan Foundation North
 WFGD Booster fan motors installed
 WFGD L07 Service bldg view to North
 WFGD View to South West
 Boiler View to South West
B30 CEB View to North