30 December, 2016

30.12.16

 ST LP Internals Installation
  ST LP Internals Installation

 ST LP Internals Installation

29 December, 2016

28 December, 2016

28.12.16

 ST LP Upper Outer Casing
  ST LP Upper Outer Casing
  ST LP Upper Outer Casing
 ST LP Internals
 ST LP Internals

26 December, 2016

26.12.16 From Existing Boiler

 Panoramic View to South
 B63 STH View to South
 Boiler View to South
 Pipe Rack View to South
 B30 CEB View to South
 B35 CEB View to South
 Boiler Air Preheater
 Boiler Backpass Walls
 Boiler Ductworks
 Boiler Tripper floor
 Boiler Air Heater view from furnace cavity
 Boiler FD Fan A Installation
 Boiler Coal Piping Installation
 LP ST installation
 B63 STH Roofing
 B63 STH - ST Brgs installation
B63 STH -  Heater Drain & CCW Pumps offloaded inside STH 
B63 STH - LO concrete Slab
 B30 CEB - MV Panels installation commenced
 B35 Boiler Electrical Bldg View to West
 B35 BEB Top view
 WFGD Area General View to East
  WFGD Area General View to East
 WFGD - L04 Pump Bldg
 WFGD - Steel & Duct Works
 WFGD - Absorber Tower
 WFGD - Booster Fan Installation
 WFGD - L04 Pumps installation
 B10 ID Fan Installation
 ESP - Hoppers installation

 G42 - Fire Fighting Cooling Tower Make up & WFGD  Pump Station 
 E06 CW Filtration Bldg 
 CW Pipes to Pump Station
 E07 CW Electrical Bldg
 E04 Cooling Tower View to North East
 Pipe Rack BOP Piping installation
  G42 - Fire Fighting Cooling Tower Make up & WFGD  Pump Station 
 F05 230 Kv Intermediate Switchyard
 E04 Cooling Tower View to East
 G05 Demin Water Plan View to East
 Laydown & Prefab Area View to East
 Laydown & Prefab Area View to South
 Coal Conveyor Steel Erection