29 November, 2018

29-11-18


Project General view from South West
Project General view from top
Project General view from West
Project General view South
 
STH @14.0m
Pipe Rack & Fly Ash Silo
 Tripper Floor
 
 FW Tank
 
 STH-HP Heating
 
 STH-LP Heating
 
 STH-Extraction Pump
 
STH @ 0.0m
 
 STH-TDFWP

19 November, 2018

19-11-18

B63 - STH area view from South-West side
B63 - STH area view from North-East side
B63 - STH elevator at 14.00 m level civil work activities
B63 - STH Excitation Transformer area view
B63 - STH power train view from West side
B63 - STH BFWP area view from North side
B01 - Boiler area view from North-East side
B01 - Boiler elevator structure wall cladding erection activities
B06 - Boiler Coal Bunker pulverizer area view
B06 - Boiler Coal Bunker area view from South side
B07 - ESP #1 area view from North-East side
B30 - CEB Electrical Bldg. area view from South-West side
B68 - Transformer area rectification work activities
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
F05 - 115 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
WFGD area view from North side
WFGD area view from East side
L04 - WFGD Pump Bldg. view from North-West side
L05 - WFGD Absorber Tower area view from East side
L05 - WFGD Absorber Tower elevator structure wall cladding erection activities
L06 - WFGD Electrical Bldg. transformer area gate installation activities
L06 - WFGD Electrical Bldg. elevator installation activities
L06 - WFGD Electrical Bldg. electrical panel view
L07 - WFGD Service Bldg. area view from North-East side
L07 - WFGD Service Bldg. gypsum storage area view
L07 - WFGD Service Bldg. gypsum conveyor area view
L07 - WFGD Service Bldg. gypsum conveyor area view
L10 - WFGD Booster Fans area view from North side
L24 - WFGD Ducts area view from South-West side
L07 - WFGD Duct gas seal fan area view
G11 - Boiler Fire Fighting CO2 tank area view from South-East side
B94 - Air Preheaters Washing Basin area view from North-East side
B94 - Air Preheaters Washing Basin rectification work activities
D06 - Ash Transfer Tower area view from B06 - Boiler Coal Bunker
D06 - Ash Transfer Tower area view from West side
D23 - Ash Receiving Station area view from South-West side
D30 - Ash Loading Station area view from North-West side
C06 - Coal Conveyors and H03 - Piperack area view from South-East side
C08 - Lignite Sub-distribution Bldg. area view from South-West side
L15 - Gypsum Transfer Tower area view from East side
Plant West side of Guard House area road work activities
Plant West side of Ash Loading Station area road work activities
Plant North side of Ash Transfer Tower area road work activities
Plant North side of Boiler Electrical Bldg. area civil work activities