B63 - STH area view from South-West side
B63 - STH Excitation Transformer area view
B63 - STH elevator at 0.00 m level civil work activities
B63 - STH elevator at 14.00 m level civil work activities
B68 - Transformer Busbar rectification work activities
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
F05 - 115 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
B01 - Boiler elevator structure wall cladding erection activities
B01 - Boiler Submerged Scrapper Conveyor area view
B01 - Boiler tubing rectification activities
B01 - Boiler Ducts tubing rectification activities
B01 - Boiler Ducts insulation rectification activities
B06 - Boiler Coal Bunker area view from South side
B06 - Boiler Coal Bunker area view from North side
B07 - ESP #1 area view from B01 - Boiler
B07 - ESP #2 area view from B01 - Boiler
WFGD area view from South-East side
WFGD area view from East side
WFGD area view from North side
L04 - WFGD Pump Bldg. Pump view
L05 - WFGD Absorber Tower area view from East side
L05 - WFGD Absorber Tower elevator structure wall cladding erection activities
L07 - WFGD Service Bldg. area view from North-East side
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
G11 - Boiler Fire Fighting Pump House area view from West side
G60 - Chemical Bulk Storage Bldg. area view from B01 - Boiler
G60 - Chemical Bulk Storage Bldg. and B94 - Air Preheaters Washing Basin area view from B01 - Boiler
B94 - Air Preheaters Washing Basin area view from South-West side
D06 - Ash Transfer Tower area view from West side
D06 - Ash Transfer Tower area civil work activities
D01 - Fly Ash Silo Storage Tank area view from B01 - Boiler
D06 - Ash Transfer Tower and D01 - Fly Ash Silo Storage Tank area view from B01 - Boiler
Ash Loading and Receiving Station conveyors area view from B01 - Boiler
Ash Loading and Receiving Station area view from B01 - Boiler
C08 - Lignite Sub-distribution Bldg. area view from South-West side
C06 - Coal Conveyors and H03 - Piperack area view from B01 - Boiler
C07 - Transfer Tower #3 area view from South-West side
C07 - Transfer Tower #4 area view from B01 - Boiler
C07 - Transfer Tower #4 platform erection activities
L15 - Gypsum Transfer Tower area view from East side
E07 - Cooling Water Electrical Bldg. area view from South-West side
Plant West side of Guard House area road work activities
Plant South side of Boiler Coal Bunker area road work activities
Plant West side of Transfer Tower #3 area civil work activities
Plant East side of Discharge Pump Station area view
No comments:
Post a Comment