09 June, 2015

09.06.15

GENERAL VIEW OF SITE FROM SOUTH WEST

WEEKLY SAFETY INDUCTION

BORING OF ELECTROSTATIC PRECIPITATORS PILE

INSTALLING REBAR CAGE OF 
ELECTROSTATIC PRECIPITATORS PILE

CASTING OF ELECTROSTATIC PRECIPITATORS PILE

INSTALLING TREMIE PIPE FOR ABSORBER TOWER PILE

ASSEMBLY OF  NOS 2 x 150 TON CRAWLER CRANES
 IN PROGRESS 

08 June, 2015

08.06.15

   PIPING WORK AT ELECTROSTATIC PRECIPITATORS AREA    

BORING ELECTROSTATIC PRECIPITATORS PILE

INSTALLING REBAR CAGE ELECTROSTATIC PRECIPITATORS PILE

CASTING ELECTROSTATIC PRECIPITATORS PILE

REBAR PREFABRICATION YARD 

APS SITE OFFICE  PROGRESS

MC SITE OFFICE PROGRESS

EGAT SITE OFFICE PROGRESS

05 June, 2015

05.06.15

GENERAL SITE VIEW FROM SOUTH WEST

DELIVERY OF PREFABRICATED CAGES FOR BOILER PILES

INSTALLING REBAR CAGE BOILER ZONE A PILE

BORING BOILER ZONE A PILE

CASTING BOILER ZONE A PILE

SITE TEMPORARY DRAINAGE NETWORK
 IN PROGRESS

CLIENT RECLAMATION OF LAY DOWN AREA
 IN PROGRESS 

04 June, 2015

04.06.15

SITE GENERAL VIEW

PILING WORK AT BOILER AREA

BORING BOILER ZONE A PILE

INSTALLING REBAR CAGE ZONE B PILE

CASTING BOILER ZONE A PILE 

PREFABRICATING OF REBAR CAGES FOR BOILER PILES

REPAIRING OF BROKEN DOWN PILING RIG BG 25 

03 June, 2015

03.06.15

SITE GENERAL VIEW FROM WEST 

SITE GENERAL VIEW FROM EAST

BORING BOILER ZONE A PILE 
WITH POLYMER STABILIZED  METHOD 

INSTALLING REBAR CAGE BOILER ZONE B PILE

CASTING BOILER ZONE B PILE

REBAR PRE-FABRICATION AREA

MOUNTING NOS 2 CRAWLER CRANE 150 TON EACH
OF NAWARAT FOR CIVIL WORK IN BOILER AREA  

02 June, 2015

02.06.15

SITE GENERAL VIEW FROM WEST

PILING WORK AT BOILER AREA

BORING BOILER ZONE B PILE 

INSTALLING REBAR CAGE BOILER ZONE B PILE 

CASTING PILES AT BOILER ZONE A 

MEASURING DEPTH OF CONCRETE BOILER ZONE B PILE 

EXTENDING REBAR PREFABRICATION YARD

01 June, 2015

01.06.15

GENERAL VIEW OF SITE FROM WEST

BORING BOILER ZONE A PILE

INSTALLING REBAR CAGE BOILER ZONE B PILE

INSTALLING HOPPER ON TREMIE PIPE FOR CASTING

CASTING BOILER ZONE A PILE

PRE-FABRICATED BOILER REBAR CAGES