03 June, 2015

03.06.15

SITE GENERAL VIEW FROM WEST 

SITE GENERAL VIEW FROM EAST

BORING BOILER ZONE A PILE 
WITH POLYMER STABILIZED  METHOD 

INSTALLING REBAR CAGE BOILER ZONE B PILE

CASTING BOILER ZONE B PILE

REBAR PRE-FABRICATION AREA

MOUNTING NOS 2 CRAWLER CRANE 150 TON EACH
OF NAWARAT FOR CIVIL WORK IN BOILER AREA  