09 July, 2015

08.07.15




B63 EXCAVATED AREA


MOBILIZATION OF RIG FROM CW AREA TO B63 AREA FOR CASING DRIVING.


BOILER ZONE B EXCAVATION IN PROGRESS


DEWATERING ARRANGEMENT IN EXCAVATED AREAS OF B63 AND B01 ZONE A


B63 PILING REBAR CAGE FABRICATION IN PROGRESS


08 July, 2015

07.07.15




RAMP CONSTRUCTION INTO B63 PILING AREA


PANORAMIC VIEW OF B63 EXCAVATED AREA (WEST)


CW PILING IN PROGRESS (MARUBENI SCOPE)


PANORAMIC VIEW OF B01 AND B63 EXCAVATION (NORTH)


EXCAVATION OF B01 BOILER ZONE B IN PROGRESS



PANORAMIC VIEW OF B01 AND B63 (SOUTH)

07 July, 2015

06.07.15


BACKFILLING IN LAYDOWN AREA (SOUTH)


B63 COMPLETED -2.0M EXCAVATION


INSTALLATION OF PILE BREAKING EQUIPMENT IN PROGRESS


PANORAMIC VIEW FROM THE WEST. B01 ZONE B EXCAVATION IN PROGRESS


PDA TEST ON B01 AND B07 PILES IN PROGRESS


PDA TEST ON B01 AND B07 PILES IN PROGRESS

04 July, 2015

03.07.15


B01 AND B63 EXCAVATION IN PROGRESS (NORTHWEST)


B01 AND B63 EXCAVATION IN PROGRESS (NORTH)


B01 AND B63 EXCAVATION IN PROGRESS (SOUTHEAST)
  

PDA PILE PREPARATION


APS OFFICE - PLASTERING IN PROGRESS 


EGAT OFFICE - PAINTING IN PROGRESS


MARUBENI OFFICE 


NAWARAT OFFICE -FINISHING WORKS IN PROGRESS

03 July, 2015

02.07.15


B01 AND B63 EXCAVATION IN PROGRESS (SOUTH)


B01 AND B63 EXCAVATION IN PROGRESS (EAST)


B01 AND B63 EXCAVATION IN PROGRESS (WEST)


02 July, 2015

01.07.15


SITE OFFICE ERECTION IN PROGRESS (ROOFING AND LINTEL+BLOCK WORKS ONGOING) 


PANORAMIC VIEW OF B01 AND B63 EXCAVATION (WEST) 


ONGOING EXCAVATION IN B63 AND B01
  

CW PILING (MARUBENI'S SCOPE) IN PROGRESS



PANORAMIC VIEW OF B01 AND B63 EXCAVATION (NORTH) 




01 July, 2015

30.06.15


PANORAMIC VIEW OF B01 AND B63 EXCAVATION (EAST)



PILE CASINGS IN FOR TOWER CRANE PILES


PANORAMIC VIEW OF B01 AND B63 EXCAVATION (SOUTH)


PANORAMIC VIEW OF B01 AND B63 EXCAVATION (NORTH)