09 July, 2015

08.07.15




B63 EXCAVATED AREA


MOBILIZATION OF RIG FROM CW AREA TO B63 AREA FOR CASING DRIVING.


BOILER ZONE B EXCAVATION IN PROGRESS


DEWATERING ARRANGEMENT IN EXCAVATED AREAS OF B63 AND B01 ZONE A


B63 PILING REBAR CAGE FABRICATION IN PROGRESS


No comments:

Post a Comment