09 October, 2015

08.10.15






PRE CONCRETING INSPECTION FOR ANCHOR BOLTS AND PEDESTALS. 


B3-3 CONCRETING IN PROGRESS


B3-3 CONCRETING IN PROGRESS


REBAR AND FORMWORKS INSTALLATION IN ZONE B


ZONE C PILE HACKING NEARING COMPLETION


EXCAVATION AND PILE BREAKING IN CW AREA IN PROGRESS


PEDESTAL CONCRETING COMPLETED AND VERIFICATION SURVEY.


08 October, 2015

07.10.15


FINAL PREPARATION PRIOR TO CONCRETING IN PILECAP A2-5



PILECAP A2-5 CONCRETING IN PROGRESS



B64 PILING IN PROGRESS



PILECAP A2-5 IN PROGRESS



SHEET PILING AND EXCAVATION IN CW 



FINALIZATION OF PILECAP A2-5 CONCRETING



FINALIZATION OF PILECAP A2-5 CONCRETING


AERIAL VIEW FROM WEST


AERIAL VIEW FROM WEST


AERIAL VIEW FROM SOUTH


07 October, 2015

06.10.15


PILECAP B3-3 PREPARATION FOR CONCRETING IN PROGRESS


CURING OF PILECAP A2-2 IN PROGRESS


CW PIPE STORAGE IN B30 AREA.
  

PILECAP B3 REBAR INSTALLATION IN PROGRESS


FORMATION AND FINALIZATION OF PILE HACKING IN ZONE C

06 October, 2015

05.10.15


PILECAP A2-2 PRE-CONCRETING INSPECTION IN PROGRESS


REBAQR INSTALLATION IN PILECAP B3-1 IN PROGRESS




WORKFRONT VIEW (NORTH)


B64 PILING IN PROGRESS 


CW SHEET PILING IN PROGRESS


PILECAP A2-2 SURFACE FINISHING IN PROGRESS


PILECAP A2-2 SURFACE FINISHING IN PROGRESS

03 October, 2015

02.10.15


WORKFRONT VIEW (SOUTH)


PILECAP B3 REBAR INSTALLATION IN PROGRESS


CEX 1ST CASING IN THE GROUND. B64 PILING STARTED. 


PREPARATION FOR PEDESTAL CONCRETING IN ZONE A IN PROGRESS (I.E. ROUGHENING, BOLT INSTALLATION ETC)

02 October, 2015

01.10.15



FORMWORKS INSTALLATION IN REMAINING AREA OF PILECAP A2 IN PROGRESS


CURING OG BLOCK B1 IN PROGRESS


ARRIVAL OF CW PIPES ON SITE


CASING INSTALLATION FOR B64 PILING 


CW PIPES IN LAYDOWN AREA.

01 October, 2015

30.09.15


POSITIONING OF PUMPS FOR PILECAP B1-1 POUR


POSITIONING OF PUMPS FOR PILECAP B1-1 POUR


POSITIONING OF PUMPS FOR PILECAP B1-1 POUR


PILECAP B1-1 CONCRETING IN PROGRESS


FORMWORK INSTALLATION FOR NAWARAT'S POUR 2 AND POUR 5 IN PROGRESS


FORMWORK INSTALLATION FOR NAWARAT'S POUR 2 AND POUR 5 IN PROGRESS


PILECAP B1 REBAR IN PROGRESS