18 October, 2015

17.10.15




AERIAL VIEW WEST


AERIAL VIEW WEST


AERIAL PLAN VIEW


AERIAL PLAN VIEW


CW AREA AND CONTRACTORS YARD


BOILER (VIEW FROM EAST)


WORKFRONT VIEW (SOUTH)


PRE-CONCRETING INSPECTION PEDESTALS ZONE A


PRE-CONCRETING INSPECTION PEDESTALS ZONE A

17 October, 2015

16.10.15


CW PIPE SADDLES REBAR INSTALLATION IN PROGRESS


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


PILECAP B3 CONCRETING IN PROGRESS


ZONE A PEDESTAL WORKS IN PROGRESS


B64 PILING IN PROGRESS

16 October, 2015

15.10.15


PILECAP C12 PRE-CONCRETING INSPECTION


PILECAP B3 FORMWORKS FINALIZATION


EXPOSED FINAL 2 PILES IN ZONE B


EXCAVATION FOR CW LINE. (MC SCOPE)


CONCRETING OF PILECAP C12


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


CURING OF PILECAP C12

15 October, 2015

14.10.15


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


B64 PILING IN PROGRESS

14 October, 2015

13.10.15


PILECAP B3 REBAR INSTALLATION IN PROGRESS


PILECAP C12 REINFORCEMENT INSTALLATION IN PROGRESS


ZONE A PEDESTAL WORKS IN PROGRESS


PILECAP B3 FORMWORK INSTALLATION IN PROGRESS



PILECAP C12 FORMWORKS IN PROGRESS

11 October, 2015

10.10.15


PEDESTAL REBAR INSTALLATION IN PROGRESS (B01 ZONE A)
  

B01 ZONE B SOUTH REBAR INSTALLATION IN  PROGRESS


PREPARATION FOR ZONE C REBAR WORKS


B64 PILING IN PROGRESS


10 October, 2015

09.10.15


B64 PILING IN PROGRESS


B64 PILING IN PROGRESS


PEDESTAL CURING IN PROGRESS