16 October, 2015

15.10.15


PILECAP C12 PRE-CONCRETING INSPECTION


PILECAP B3 FORMWORKS FINALIZATION


EXPOSED FINAL 2 PILES IN ZONE B


EXCAVATION FOR CW LINE. (MC SCOPE)


CONCRETING OF PILECAP C12


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


PRE-CONCRETING INSPECTION FOR EMBEDDED ITEMS (PEDESTALS ZONE A)


CURING OF PILECAP C12

No comments:

Post a Comment