31 October, 2015

30.10.15


WORKS PROGRESSING ON PILECAP B1 ZONE B


PEDESTAL PREPARATION IN ZONE A


PRE CONCRETING CHECKS IN B01 BOILER ZONE A 


PRE CONCRETING CHECKS IN B01 BOILER ZONE A 