03 November, 2016

03.11.16 Aerial Pictures

Power Island view to North
Site Overview to North East
Power Island Overview to North
Power Island Overview to North
ECS Area & BOP Area View to North East
ESP Ground Fabrication Laydown Area
Cooling Tower View to North East
Laydown Area 7 View to East
ECS - ESP & WFGD Area Top View
Power Island Top View
B63 STH/B30 CEB/B68 Transformers/F05 SY Top View 
Boiler & STH Top View
Boiler Furnace opening Top View
Boiler Backpass opening Top View
SY & Transformers Area Top View
Laydown Area 1,2 & 3 View to South East 

03.11.16 Deareator Lifting
























01 November, 2016

01.11.16

 Boiler Overview to West
 Boiler Pressure part (backpass) installatin
  Boiler Pressure part (backpass) installation
 Condenser Neck ground assembly
 Condenser Neck ground assembly
 F05 SY for SST View to North
 FW Tank Preparation for lift into structure
 FW Tank Preparation for lift into structure
 B63 STH GL 1-2 Slab poured
 B64 STG Foundation soffit stripping in progress
B30 CEB Lev.+0.00 Cable trays installation
 B30 CEB View to North
 B35 CEB Ground beams installation in progress
 B68 GSUT foundation View to East
 WFGD Ductworks in progress
 WFGD Absorber embedded ring preparation for grout
 WFGD L07 Service Bldg foundations View to North
WFGD - L04 Pump Bldg foundations View to South West
 Stack Steel Liner Installation in progress
 Stack borosilicate
 H03 Pipe Rack Piping installation in progress