Boiler Overview to West
Boiler Pressure part (backpass) installatin
Boiler Pressure part (backpass) installation
Condenser Neck ground assembly
Condenser Neck ground assembly
F05 SY for SST View to North
FW Tank Preparation for lift into structure
FW Tank Preparation for lift into structure
B63 STH GL 1-2 Slab poured
B64 STG Foundation soffit stripping in progress
B30 CEB Lev.+0.00 Cable trays installation
B30 CEB View to North
B35 CEB Ground beams installation in progress
B68 GSUT foundation View to East
WFGD Ductworks in progress
WFGD Absorber embedded ring preparation for grout
WFGD L07 Service Bldg foundations View to North
WFGD - L04 Pump Bldg foundations View to South West
Stack Steel Liner Installation in progress
Stack borosilicate
H03 Pipe Rack Piping installation in progress