07 November, 2016

07.11.16

 Site Overview to South West
 Boiler Furnace opening View to North 
 Boiler Pressure Part Furnace Hanging elements
 Boiler Pressure Part Furnace Hanging elements
Boiler  Flash Tank and Flash Tanks Drain
 PA Fan south of Boiler preparation for installation
B64 STH GL 4-5 ground works 
 B64 STH Deareator installation
 B30 CEB Dry Transformers Installation
 B30 CEB View of West Side
 B30 CEB Cable Trays Erection Lev.0.00
B30 CEB Cable Trays Erection Lev.0.00
 B35 BEB ground beams backfilling View to West
 ESP Steel Erection View to North
 B10 ID Fan Foundation poured
 B17 FGD Outlet View to North
 WFGD Ductworks internal view
 WFGD Absorber embedded ring poured 
 WFGD L07 Service Bldg View to North
 WFGD L04 Pumps Bldg ground beams & backfill in progress 
 E06 CW Blddg Slab poured