 Condenser Howell ground assembly
 GSUT Transformer Foundation
 B30 Electrical Bldg View to North
 Conderser skidding Frame
 B63 STH Unloading bay  
 Main Steam Pipes from Boiler to STH  
 B63 STH South Side
 Boiler FD Fan Erection South
 Boiler Pressure part erection
 Boiler FD Fan Erection North
 Boiler Air Preheater View to North East
 ESP Steel Erection View to North West
 Boiler ammonia tank
 Stack Bird Logo Design
 Stack Bird logo template
 Stack internal view 
 WFGD Ducting ground fabrication in position
 WFGD Absorber final grouting
 WFGD E04 Pumps Bldg foundations
 Site Overview to South West
 B35 BEB Slab rebar
 STH CCW Heatexchangers lev.0.00
 STH CCW Heatexchangers lev.0.00
 B30 CEB  Lev. 0.00 Cable Trays Supports installation
SST Transformer on foundation