Boiler EXT Pass Floor Ground Fabricated and Transported Inside Cavity
Boiler Rear Arch Erected - View Looking East
Boiler Windbox Duct Ground Fabrication in Progress on South Side of Unit
Laydown Area 3 Boiler Ground Fabrication Area
Boiler Feeder Floor
Start-Up System Piping to Flash Tank - View Looking East
B63 STH Lev. 14.00 Slab in progress
B64 STG Table Top elephant feet installation
B63 STH Lev. 14.00 Slab view to North
B64 STG Table Top elephant feet installation
B64 STG Table Top elephant feet grouting
B64 STG Table Top sikadur for grout of elephant feet
Deareator Tank
Auxiliary Transformer installation
B63 STH Loading Bay
Main Steam Pipes from Boiler to STH
B35 BEB View to East