23 November, 2016

23.11.16

 Boiler EXT Pass Floor Ground Fabricated and Transported Inside Cavity 
 Boiler Rear Arch Erected - View Looking East
 Boiler Windbox Duct Ground Fabrication in Progress on South Side of Unit
 Laydown Area 3 Boiler Ground Fabrication Area
 Boiler Feeder Floor
 Start-Up System Piping to Flash Tank - View Looking East
 B63 STH Lev. 14.00 Slab in progress
 B64 STG Table Top elephant feet installation 
  B63 STH Lev. 14.00 Slab view to North
  B64 STG Table Top elephant feet installation 
  B64 STG Table Top elephant feet grouting
  B64 STG Table Top sikadur for grout of elephant feet
 Deareator Tank 
 Auxiliary Transformer installation
 B63 STH Loading Bay
  Main Steam Pipes from Boiler to STH  
 B35 BEB View to East