23 January, 2017

23.01.17 - Aerials

 Top view : Power Plant + laydowns
 Top View: Power Plant
 Top View: Power Block + FF & WFGD
 Top View: Boiler
 Top View: FF & WFGD
 Top View: Back end - Air coolers
 General View from South West with laydowns
 General View from South West
 General View from North West
 General View From West
  General View From West
 General View from South: Turbine Hall, Boiler, FF
 
General View from North: Boiler & Turbine Hall
 Boiler, general View from South East
  Boiler, general View from North East
 Boiler, Air preheater + SCR
 Boiler Tripper Floor
 View between Boiler & Turbine Hall, HP piping
 General View: Transformers, CEB & Turbine Hall
  General View: Transformers, CEB & Turbine Hall
   General View: Transformers, CEB & Turbine Hall
 Turbine Hall View from South West
 Turbine Hall View from South 
 Turbine Hall View from South 
 Turbine Hall View from North
 Turbine Hall: +14 m Turbine Table from Generator side
 Turbine Hall: +14 m Turbine Table South end (LP upper casing + tools container)
 Turbine Hall: Polishing Plant (B95) fondations
 Central Electrical Building 
 Boiler Electrical Building
Cooling Towers
 Cooling Towers
 Underground Tanks & Cooling Towers
 Pump House, Cooling Towers, Underground Tanks
 Underground Tank & Cooling Towers
 Pump House for Cooling Towers
 Demineralization Area (building, treatment & Tanks)
 South Laydown areas
 East Laydowns, demin & conveyors
 South Laydowns (boiler)
East Laydowns

23.01.17

H01 Mech. System networks - Pipe trench to Existing Plants view to North
B68 -  SST Transformer - North West view
H01 Mech. System networks - Pipe trench to Existing Plants view to South
B68 - Transformer area - SST Transformer oil filling activities
B68 - Transformer area - SST Transformer oil filling activities
B68 - Gen Transformer area -  North side view
B30 - CEB External Area South side view
B30 - CEB External -South side view - Electrical Duct bank & Pits construction
B63 - STH Condenser Erection
B63 - B01 Corridor between STH and Boiler
B95 - Condensate Polish Plant Civil works construction
B63 - STH External - South side view
B01 - Boiler Pressure part wall panels erection
B01 - Boiler Pressure part wall panels erection
B01 - Boiler Pressure part wall panels erection
B01 - Boiler Pressure part wall panels erection
B01 - Boiler temporary Tower crane foundation
B01 - Boiler FD Fan erection
B07 - ESP erection - South West side view

B01 - Boiler external - South East side view
B07 - ESP erection - South East side view
B10 - ID Fan erection - South side view
B17 - Flue Gas duct to stack - pre-assembly activities
B02 - Stack Flue Gas duct  erection activities
B02 - Stack Flue Gas duct  erection activities
L04 - WFGD Pump Building Steel structure erection activities
L05 - WFGD Absorber Reactor tower erection activities
WFGD - Flue Gas Desulfuration Area - Civil Works 
B17 - Flue Gas duct to stack - East side view
G42 - Fire Fighting Pump station Building Construction
WFGD - Flue Gas Desulfuration Area - East side view
H03 - Pipe rack to STH  piping erection
WFGD - Flue Gas Desulfuration Area - North East side view
B07 - ESP erection - North East side view
B10 - ID Fan erection - North side view
B01 - Boiler view  - South West side view
B35 -  BEB Boiler Electrical Building Construction
B63 - STH External - North side view
B30 - ECB External - North side view
B30 - ECB - Cable trays erection
B63 - STH Perimeter concrete block wall
B63 - STH Elv +0.00  CCW Exchangers erection
B63 - STH Condenser Erection
B63 - STH Baby Turbine Columns construction
B63 - LP3 Recovery Drain pump erection activities
B63 - STH Elev + 0.00 Equipment foundation civil works
General External - North West side view