19 May, 2015

19.05.15

GENERAL VIEW BOILER WORKS TO SOUTH WEST

WEEKLY SAFETY INDUCTION

SETTING OUT OF PILE BOILER ZONE B 

INSTALLATION OF REBAR CAGE IN BOILER ZONE B 

BORING PILE IN BOILER ZONE A

INSTALLATION OF TREMIE PIPE IN  BOILER ZONE A 

CASTING PILE IN  BOILER ZONE A 

EPC SITE OFFICE - FOUNDATION WORKS IN PROGRESS

18 May, 2015

18.05.15


GENERAL VIEW BOILER PILING WORKS TO WEST 

BORING IN BOILER ZONE A 

INSTALLING PILE REBAR CAGE ZONE B 

CASTING PILE BOILER ZONE A 

BOILER PILE REBAR CAGE FABRICATION

REMOVAL OF EXCAVATED MATERIAL FROM SITE

APS SITE OFFICE - FOUNDATION WORK IN PROGRES

EGAT SITE OFFICE - INSTALLATION OF FIRST COLUMN

BATCHING PLANT MMO-01 IN OPERATION

BATCHING PLANT MMO-02 IN OPERATION



16 May, 2015

15.05.15

 GENERAL SITE VIEW ACROSS THE BOILER TO THE NE

 PILING IN BOILER ZONE B

PILING IN BOILER ZONE A 

PILING IN BOILER ZONE B 

CHECKING DEPTH OF BORE BOILER ZONE A

BOILER "LONG" PILE TP-B24 UNDER RETEST


14 May, 2015

14.05.15

RELOCATION OF RIG TO BOILER ZONE B CENTRAL 

 INSTALLATION OF REBAR CAGES

 CASTING OF BOILER ZONE B PILES

THIRD MMO RIG ON MECHANICAL STAND DOWN  

BORING BOILER ZONE A PILES

13 May, 2015

13.05.15

THIRD SITE RIG IS MOBILISED - BAUER BG 25 

BORING BOILER ZONE C "LONG" PILE 

CASTING BOILER ZONE B PILES  

 BORING BOILER ZONE B PILE

CENTRAL BOILER PILING SURVEY CONTROL AREA 

 BORING BOILER ZONE B PILE

GENERAL SITE VIEW LOOKING WEST

11 May, 2015

11.05.15

GENERAL VIEW OF BOILER WORKS FROM THE EAST 

 INSTALLING PILE REBAR CAGE IN ZONE B

 CASTING PILE IN BOILER ZONE B

 CASTING BOILER PILE IN ZONE A

 BORING PILE IN BOILER ZONE A

ADDITIONAL TRIAL MIXES IN SITE BATCHING PLANT UNIT 1

09.05.15

BOILER PILE REBAR CAGE PREFABRICATION

 
BORING BOILER ZONE A PILES

 BORING BOILER ZONE A PILES 

 REBAR CAGE INSTALLATION ZONE A

CASTING BOILER ZONE A 1200MM DIA PILE 

 BORING BOILER ZONE B

 GENERAL VIEW FROM EAST LOOKING WEST OVER THE BOILER WORKS