28 February, 2017

28-02-17

B30 - CEB Electrical Building Roof structure view
B30 CEB Electrical Building + C01 Fuel oil tank view
B30 - CEB Electrical Building - Trafos. Bus duct support construction
B68 - Main transformer Area
B30 - CEB Electrical Building - Start cable pulling activities
B30 - CEB Electrical Building - Bus bars erection
B30 - CEB Electrical Building Start cable pulling activities
B30 - CEB Electrical Building LV panels erection
B35 - BEB Electrical Building construction
B35 - BEB Electrical Building construction
H03 -  STH External - Pipe rack to STH West side view
H03 -  STH External - Pipe rack to STH West side view
B63 - STH Main Lube oil room construction
B63 - STH Baby turbines structure construction
B63 - STH Baby turbines structure construction
B63 - STH Baby turbines structure construction
B63 - STH Platforms erection FW tank area
B95 -  STH External - Condensate Polishing Plant construction
B01 - Boiler FD Fan and PA Fan Area North
B01 - Boiler FD Fan and PA Fan Area South
B01 - Boiler Pressure parts erection
B07 - ESP Ground slab Civil works
G21- NH3 storage building construction
G21- NH3 storage building construction
WFGD Area - L07 Bldg. construction
WFGD Area - L06 Bldg. construction

23 February, 2017

23-02-17

F05 - Switchyard 115 kV Supports / Gantry's  erection
B68 - SST Transformer area erection
F05 - Switchyard 115 kV Supports / Gantry's  erection
F05 - Switchyard 115 kV Supports / Gantry's  erection
B30 - B68 - SST Transformer  bus bars erection
B30 - CEB Electrical Building North side view
B30 - CEB Electrical Building cable trays erection
B35 - BEB Electrical Building cable trays erection
B35 - BEB Electrical Building construction
B35 - BEB Electrical Building construction
B35 - BEB Electrical Building General view from West
B35 - BEB Electrical Building  Aux.Transformers erection
C01 - Fuel oil tank erection
B63 - STH & Pipe rack North side view
B63 - STH Cooling water pipe erection
B63 - STH Baby turbines construction
B63 - STH Lube oil room construction
B63 - STH Lube oil room construction
B63 - STH External area cable ducts and pits construction
B95 -  STH External - Condensate Polishing Plant construction
B63 - STH General view elev +14.00m
B63 - STH CCWS Pump erection
B63 - STH HP / LP piping erection
B63 - STH HP / LP piping erection
B63 - STH Gland steam Condenser erection
B01 - Boiler Roof structure erection
B01 - Boiler piping erection
B01 - Boiler Coal feeder system erection
B01 - Boiler coal piping erection
B01 - Boiler Drum and piping erection
B01 - Boiler pressure parts erection
B01 - Boiler PA Fan erection
B01 - Boiler FD Fan and PA Fan erection South
B01 - Boiler FD Fan and PA Fan erection North
H03 - Pipe rack to STH view from Boiler Area
B01 - Boiler FD Fan and PA Fan erection South - East view
B01 - B37 - Boiler and ESP South - East view
B37 - ESP North - West view
B37 - ESP South - East view
B10 - IDF Induced draft fan North side
B10 - IDF Induced draft fan South side
General view Pipe rack + WFGD Area + Cooling water Area from North-West
General view Pipe rack & ESP from North-West
WFGD Area civil works construction
L06 - WFGD Electrical Building construction
L06 - WFGD Electrical Building construction
L24 - Flue gas ducts view from South

B02 - Stack view from West
B02 - Stack exhaust duct
E06 - Cooling water treatment Building view from WFGD concrete tank
G05 - Demineralization Plant view
G05 - Demineralization Plant Building
G02 & G05 - Water tanks
C06 - Coal conveyor from Existing coal yard South side view