B30 ECB Electrical Bldg. & C01 Fuel Oil Tank Area
F05  H.V. Intermediate Block Switchyard 115 kV Gantry's erection
F05  H.V. Intermediate Block Switchyard 230 kV Civil works
CEB Electrical Building  + Transformer area South West view
B30 - CEB +4.00m Electrical Building LV Panels erection
B30 - CEB +11.50m Electrical Building Battery Room - Racks erection
B30 - CEB +4.00m Electrical Building MV Panels erection activities
B30 - CEB Electrical Building South side view
B35- BEB Boiler Electrical Building Construction
B95- CPP Condensate Polish Plant Construction
B63 - STH  Lube oil room construction
B63 - STH  Baby Turbines construction
B63 - STH  External cable pit - duct construction
B64 - STG - HP Turbine erection
B64 - STG - IP Turbine erection
B64 - STG - IP Turbine erection
B64 - STG - LP Turbine erection
B64 - STG - Power Train HP - IP - LP Turbine erection
B64 - STG - Power Train HP - IP - LP Turbine erection
B01 - Boiler Pressure parts erection
B01 - Boiler Pressure parts erection
STH - Boiler South side view
B01 - Boiler Pulverizers erection
B01 - Boiler East side view
B01 - Boiler East - North side view
B01 - Boiler South side view
B07 - ESP Casing Steel support erection
B07 - ESP Casing Steel support erection
B10 - Induced draft Fans erection
L05 - WFGD Absorber - Reactor Tower erection
L04 - WFGD Pump Building Steel structure erection
WFGD Area East - North side general view 
L10 - WFGD Booster Fans Foundations
WFGD Area - East side general view 
WFGD Area - Concrete tanks construction
L24 - Flue gas ducts Steel structure erection
WFGD Area - Pipe Trenches and Civil works Construction
G42 - Fire Fighting Pump Station Construction
L07 /L08 - WFGD Service Building Construction
E04 - Cooling Tower Construction
E04 - Cooling Tower Construction
E07 - Electrical & Control Building for Cooling Water - Transformers erection