06 February, 2017

06.02.17

B30 - CEB +4.00m Electrical Building HVAC ducts erection
B30 - CEB +11.50m Electrical Building LV panels installation
B30 - CEB +16.00m Electrical Building construction
F05  H.V. Intermediate Block Switchyard 115 kV Gantry's erection
F05  H.V. Intermediate Block Switchyard 115 kV Gantry's erection
B63 - STH External duct bank construction
B63 - STH External Cooling water pipes erection
B63 - STH  Lube oil room construction
B63 - STH  Baby turbines concrete structure construction
B63 - STH  Baby turbines concrete structure construction
B63 - STH Roof installation
B35 - BEB Boiler Electrical Building construction
B35 - BEB Boiler Electrical Building +0.00m cable cellar area
B01 - Boiler Roof Steel structure erection
B01 - Boiler Roof Steel structure erection
B01 - Boiler Pressure parts erection view
B01 - Boiler Pressure parts erection view
B01 - Boiler Pressure parts erection view 
B01 - Boiler Coal feeder concrete floor slab
B01 - Boiler FD Fan Erection view
WFGD Area - Civil works  construction
WFGD Area construction
WFGD Area - Concrete tanks construction
WFGD Area - Tanks and Foundations construction
G40 - F.F. underground tank construction
G42 - F.F. Pump Station construction
E04 - Cooling Tower Area - Underground pipes installation 