15 March, 2017

15--03-17

F05 - Switchyard 230kV Supports erection
F05 - Switchyard 230kV Civil Construction & Supports erection
F05 - Switchyard Area F.F. piping and duct pits
F05 - Switchyard 115 kV Supports / Gantry's  erection
F05 - Switchyard 115 kV Supports / Gantry's  erection
C01 - Fuel oil tank erection
B63 - STH Cooling water pipe erection
B63 - STH pipe erection
B63 - STH  B42 Start-up Pump erection
B63 - STH CCWS Pump erection
B63 - STH Auxiliary Pump erection
B63 - STH Auxiliary Pump erection
B63 - STH Booster Pump erection
B63 - STH CCWS Pump erection
B63 - STH Pump and Piping erection
B63 - STH Piping erection
B63 - STH Condensate Extraction pump erection
B63 - STH Auxiliary equipment foundation
B68 - Main transformer Area
B95 - Condensate Polishing Plant construction
B01 - Boiler pressure parts erection
B01 - Boiler pressure parts erection
B01 - Boiler ground Area view
B01 - Boiler Piulverizer erection
B01 - Boiler FD Fan erection
B01 - Boiler pressure parts erection
B37 - ESP South - West view
B01 - Boiler FD Fan and PA Fan South side view
B37 - ESP South view
L24 - WFGD Flue gas ducts erection South-West side view
B10 - Induced Draft Fan South side view
L24 - WFGD Flue gas ducts structure erection
L24 - WFGD Flue gas ducts structure erection
E07 - Electrical & Control Bldg. for CW Area
E04 - Cooling Tower Construction
E12 - Circulating Water pump station view
E06 - Circulating Water treatment & filtration Bldg.
G42 - Fire Fighting pump station South-East view
E04 - Cooling Tower Construction
L07 - WFGD Service Building construction
E06 - Circulating Water treatment & filtration Bldg.
G42 - Fire Fighting pump station South-West view
L10 - WFGD Booster Fans Building construction
L05 - WFGD Adsorber / Reactor tower erection
L04 - WFGD Pump Building Erection
L24 - WFGD Flue gas ducts view from North-East
B37 - ESP North-East side view
B10 - ID Fan North side view
H03 - Pipe Rack to STH South-East view
B01 - Boiler North-East side view
B37 - ESP North-West view
B01 - Boiler PA Fan North side view
B01 - Boiler  FD Fan North side view
D30 - Ash loading Station construction
H03 - Pipe Rack  and C01- Fuel Oil tank view
H03 - Pipe Rack Piping erection
B35 - BEB Boiler  Electrical Building - Aux. Trafos. erection
B01 - Boiler Pulverizer Erection - North side view
B30 B68 - CEB & SST trafos Busbars erection North side view

No comments:

Post a Comment