03 January, 2018

03-01-18

Plant view from North-West side
Plant view from West side
Plant view from South-West side
B63 - STH West side wall cladding erection activities
B63 - STH North side wall cladding erection activities
B63 - STH West side area civil work activities
B01 - Boiler Slag Conveyor support structure erection activities
B01 - Boiler Slag Conveyor platform erection activities
B01 - Boiler Submerged Scrapper Conveyor Sluice Pump Skid installation activities
B01 - Boiler Seal Air Fan A & B foundation civil work activities
B01 - Boiler North FD Fans & PA Fans view
B01 - Boiler South FD Fans & PA Fans view
B01 - Boiler SCR Ammonia Flow Control skid view
B01 - Boiler SCR De-humidification skid view
B10 - Boiler North ID Fan A area view
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B01 - Boiler and B07 - ESP area view from South side
B30 - CEB Electrical Bldg. area view from South-West side
B30 - CEB Electrical Bldg. area view from South side
B30 - CEB Electrical Bldg. corridor area view
B30 - CEB Electrical Bldg. Main Control DCS room view
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. meeting room view
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
B07 - ESP 2 insulation & cladding erection activities
B07 - ESP 1 view from North-East side
B17 - Flue Gas Ducts and B07 - ESP 1 view from North-West side
B35 - BEB Electrical Bldg. area view from South side
B95 - CPP Bldg. view from South-West side
B95 - CPP Bldg. instrument panel cable termination activities
B95 - CPP Bldg. control panel cable termination activities
WFGD view from South-East side
WFGD view from North side
WFGD view from E04 - Cooling Tower 
L04 - WFGD Pump Bldg. wall cladding erection activites
L05 - WFGD Absorber / Reactor Tower re-circulation pipe erection activities
L06 - WFGD Electrical Bldg. view from North-West side
L09 - WFGD Auxiliary Storage Tank view from South-West side
L24 - WFGD Ducts insulation & cladding erection activities
L24 - WFGD Ducts underground cable pit civil work activities
L36 - WFGD SRS and L07 - Service Bldg. view from E04 - Cooling Tower
L36 - WFGD SRS and L07 - Service Bldg. view from South-East side
C01 - Fuel Oil Storage Tank area view from West side
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
Auxiliary Steam piperack crossing pipe erection activities
Auxiliary Steam piperack crossing pipe erection activities
Auxiliary Steam piperack crossing from existing EGAT plant view
G11 - Boiler Fire Fighting Pumping House civil work activities
G28 - Oil & Fire Fighting Water Recovery Pit area civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
B94 - Air Pre-Heater Washing Basin area civil work activities
D06 - Ash Transfer Tower structure erection activities
D07 - Slag Conveyors module structure preassembly activities
D30 - Ash Loading Station structure erection activities
D30 - Ash Loading Station structure erection activities
D30 - Ash Loading Station structure view from East side
D08 - Fly Ash Sub-Distribution Bldg. view from South-West side
D08 - Fly Ash Sub-Distribution Bldg. view from South-East side
D08 - Fly Ash Sub-Distribution Bldg. view from North-West side
D08 - Fly Ash Sub-Distribution Bldg. electrical panel view
D08 - Fly Ash Sub-Distribution Bldg. control room view
D20 - Fly Ash Compressor Bldg. view from West side
C08 - Lignite Sub-Distribution Bldg. view from South-West side
C08 - Lignite Sub-Distribution Bldg. view from South-East side
C08 - Lignite Sub-Distribution Bldg. electrical panel view
C08 - Lignite Sub-Distribution Bldg. electrical panel view
G42 - Fire Fighting Pumping Station area view from South-East side
Fire Fighting Raw Water Reservoir view from E04 - Cooling Tower
G42 - Fire Fighting Pumping Station view from E04 - Cooling Tower
G42 - Fire Fighting Pumping Station pump equipment view
G42 - Fire Fighting Pumping Station pump equipment view
G42 - Fire Fighting Pumping Station pump equipment view
G06 - Demin. Effluent Neutralization Bldg. view from South side
E04 - Cooling Tower view from North-West side
E04 - Cooling Tower view from South-West side
E04 - Cooling Tower fan motors cable termination activities
E07 - Cooling Water Electrical Bldg.view from E04 - Cooling Tower
E07 - Cooling Water Electrical Bldg. electrical panel view
E12 - Cooling Tower Pumping Station view
E12 - Cooling Tower Pumping Station view from North side
C06 - Coal Conveyors module #5 and #6 erection activities
C06 - Coal Conveyors and H03 - Piperack view
L12 - Gypsum Conveyors structure erection activities
H03 - Piperack towards B07 - ESP view from East side
H03 - Piperack towards B07 - ESP view from West side
Plant East side of WFGD area underground drain pit civil work activities
Plant East side of WFGD area underground drain pipe installation activities
Plant South side of WFGD area underground fire fighting pipe erection activities
Plant South side of Boiler area underground civil work activities

No comments:

Post a Comment