Plant view from South-West side
B63 - STH view from South-East side
B63 - STH North side wall cladding erection activities
B63 - STH West side wall cladding erection activities
B63 - STH West side area civil work activities
B63 - STH Excitation Transformer equipment installation
B01 - Boiler view from South-East side
B01 - Boiler Slag Conveyor module structure erection activities
B01 - Boiler South FD Fans & PA Fans view
B01 - Boiler North FD Fans & PA Fans hoist installation
B01 - Boiler Seal Air Fan A & B pipe installation
B01 - Boiler Submerged Scrapper Conveyor area view
B01 - Boiler South side Acid cleaning system temporary pipe view
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B30 - CEB Electrical Bldg. area view from South-West side
B30 - CEB Electrical Bldg. area view from South side
B30 - CEB Electrical Bldg. entrance area view
B30 - CEB Electrical Bldg. corridor area view
B30 - CEB Electrical Bldg. corridor view
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. server room view
B30 - CEB Electrical Bldg. meeting room civil work activities
B30 - CEB Electrical Bldg. meeting room windows installation
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
B07 - ESP area view from South-East side
B07 - ESP 2 view from South side
B07 - ESP 2 South side pipe sleepers civil work activities
B07 - ESP 1 view from North-East side
B07 - ESP 1 pipe erection activities
B17 - Flue Gas Ducts towards B07 - ESP 1 erection activities
B17 - Flue Gas Ducts towards B07 - ESP 2 erection activities
B68 - Transformer area view from South side
B68 - Transformer area fire fighting pipe installation
B68 - Transformer area fire fighting pipe installation
B95 - CPP Bldg. roof sheeting erection activities
WFGD view from South-East side
WFGD view from E04 - Cooling Tower
WFGD view from North side
WFGD view from East side
L04 - WFGD Pump Bldg. view from North-East side
L04 - WFGD Pump Bldg. view from South-East side
L05 - WFGD Absorber / Reactor Tower view from East side
L06 - WFGD Electrical Bldg. view from North-West side
L06 - WFGD Electrical Bldg. staircase erection activities
L06 - WFGD Electrical Bldg. view from South-East side
L06 - WFGD Electrical Bldg. wall cladding support installation
L07 - WFGD Service Bldg. view from E04 - Cooling Tower
L07 - WFGD Service Bldg. Gypsum storage floor area view
L07 - WFGD Service Bldg. ground floor tanks view
L09 - WFGD Auxiliary Storage Tank and L36 - SRS Bldg. view from E04 - Cooling Tower
L10 - WFGD Booster Fans platform & roof structure erection activities
L24 - WFGD Ducts view from South side
L24 - WFGD Ducts area view from South-West side
L24 - WFGD Ducts area view from North-East side
L24 - WFGD Ducts underground cable pit civil work activities
L36 - WFGD SRS Bldg. and L07 - Service Bldg. view from E04 - Cooling Tower
L36 - WFGD SRS Bldg. and L07 - Service Bldg. view from South-East side
L36 - WFGD SRS Bldg. view from E04 - Cooling Tower
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
C01 - Fuel Oil Storage Tank area view from North-West side
C01 - Fuel Oil Storage Tank erection activities
C01 - Fuel Oil Storage Tank area fire fighting PA system installation
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C03 - Fuel Oil Pump Station and C01 - Fuel Oil Storage Tank area view from North-East side
Auxiliary Steam piperack crossing pipe erection activities
Auxiliary Steam piperack crossing pipe erection activities
G11 - Boiler Fire Fighting Pumping House roof structure erection activities
G28 - Oil & Fire Fighting Water Recovery Pit civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin civil work activities
B94 - Air Pre-Heater Washing Basin civil work activities
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
D30 - Ash Loading Station and L12 - Gypsum Conveyors module erection activities
D08 - Fly Ash Sub-Distribution Bldg. view from South-West side
D08 - Fly Ash Sub-Distribution Bldg. view from South-East side
D20 - Fly Ash Compressor Bldg. view from West side
C08 - Lignite Sub-Distribution Bldg. view from South-West side
C08 - Lignite Sub-Distribution Bldg. view from South-East side
C08 - Lignite Sub-Distribution Bldg. electrical panel installation
C08 - Lignite Sub-Distribution Bldg. electrical panel view
C08 - Lignite Sub-Distribution Bldg. electrical panel view
C08 - Lignite Sub-Distribution Bldg. battery room view
G42 - Fire Fighting Pumping Station view from E04 - Cooling Tower
G42 - Fire Fighting Pumping Station pump equipment view
G42 - Fire Fighting Pumping Station pump equipment view
Fire Fighting Raw Water Reservoir view from E04 - Cooling Tower
G42 - Fire Fighting Pumping Station area view from South-East side
G06 - Demin. Effluent Neutralization Bldg. view from South side
G06 - Demin. Effluent Neutralization Bldg. and C07 - Transfer Tower #3 area view from South side
E04 - Cooling Tower view from South-West side
E04 - Cooling Tower view from North-West side
E06 - Cooling Water Treatment Bldg. view from South-West side
E07 - Cooling Water Electrical Bldg. view from E04 - Cooling Tower
E07 - Cooling Water Electrical Bldg. view from South-West side
E07 - Cooling Water Electrical Bldg. electrical panel view
E07 - Cooling Water Electrical Bldg. electrical panel cable termination activities
E12 - Cooling Tower Pumping Station view
E12 - Cooling Tower Pumping Station view
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C06 - Coal Conveyors and H03 - Piperack view
C06 - Coal Conveyors module gallery #4 erection activities
C06 - Coal Conveyors module gallery #4 erection activities
H03 - Piperack towards B07 - ESP view from East side
H03 - Piperack area cable pulling activities
L12 - Gypsum Conveyors module & structure erection activities
L12 - Gypsum Conveyors module pre-assembly activities
L15 - Gypsum Transfer Tower foundation view
K04 - Guard House civil work activities
Plant South-West side of Switchyard area road work activities
Plant West side of Switchyard area road work activities
Plant West side of Transformer area road work activities
Plant South side area road work activities
Plant South side of Boiler area road work activities
Plant South-West side drainage civil work activities
Plant West side of Switchyard area drainage civil work activities
Plant North-West side of Switchyard area drainage civil work activities
Plant South side drainage civil work activities
Plant South side drainage civil work activities
Plant East side of WFGD area underground drain pipe installation activities
Plant East side of WFGD area underground drain pit civil work activities
Plant South side of ESP area underground fire fighting pipe erection activities
Plant South side of ESP area underground fire fighting pipe erection activities
Plant South side of WFGD area underground fire fighting pipe erection activities
Plant South side of WFGD area underground fire fighting pipe erection activities
Plant South side of Boiler area underground fire fighting pipe erection activities
Plant South side of WFGD area underground fire fighting pipe erection activities