20 April, 2018

20-04-18

B63 - STH view from South-West side
B63 - STH view from South-East side
B63 - STH turbine Feedwater Tank area view
B64 - ST turbine area view
B64 - ST turbine view from North-East side
B64 - ST turbine view from North side
B64 - ST turbine view from North-West side
B64 - ST LP turbine view from South-East side
B64 - Generator area view from South-West side
B64 - Generator area view from South-East side
B63 - STH loading bay area steam blow pipe restoration activities
B64 - STH BFWP area view from South-East side
B64 - STH BFWP #1 view
B64 - STH BFWP #2 view
B01 - Boiler view from South-East side
B01 - Boiler view from North-East side
B01 - Boiler ducts insulation activities
B01 - Boiler SCR ducts insulation activities
B01 - Boiler SCR ducts insulation activities
B01 - Boiler furnace insulation activities
B01 - Boiler Ammonia injection pipe insulation activities
B01 - Boiler Coal Bunker tripper deck car area view
B01 - Boiler Coal Bunker tripper deck area view
B01 - Boiler Coal Bunker conveyor belt from C07 - Transfer Tower #4 view
C07 - Transfer Tower #4 conveyor belt & equipment view
C07 - Transfer Tower #4 conveyor belt equipment installation
C07 - Transfer Tower #4 conveyor towards B01 - Boiler Coal Bunker wall cladding installation
C06 - Coal Conveyor and L15 - Gypsum Conveyor view from B01 - Boiler
C06 - Coal Conveyor belt view
C06 - Coal Conveyor belt from C07 - Transfer Tower #3 view
C07 - Transfer Tower #4 view from B01 - Boiler
C07 - Transfer Tower #3 area firefighting pipe installation
B07 - ESP view from B01 - Boiler
B07 - ESP view from North-West side
B07 - ESP view from North-East side
B07 - ESP #1 view from B01 - Boiler
B07 - ESP #2 view from B01 - Boiler
B07 - ESP #2 view from South side
B07 - ESP #2 outlet duct towards B10 - ID Fan B area view from South side
B17 - Flue Gas Ducts towards B07 - ESP 2 area view from South-West side
WFGD area view from North-West side
WFGD area view from North side
WFGD area view from South-West side
L05 - WFGD Absorber / Reactor Tower view from C06 - Coal Conveyor
L06 - WFGD Electrical Bldg. and L07 - Service Bldg. view from North-West side
L07 - WFGD Service Bldg. view from North-East side
G60 - Chemical Bulk Storage Bldg. and H03 - Piperack area view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank and C06 - Coal Conveyor area view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank view from B01 - Boiler
D06 - Ash Transfer Tower and D07 - Slag Conveyor view from B01 - Boiler
C06 - Coal Conveyors and Ash Loading & Receiving conveyors area view
Ash Loading & Receiving Staion area view
D23 - Ash Receiving Station view from C07 - Transfer Tower #4
D23 - Ash Receiving Station and conveyor tie-in point with existing EGAT plant view from C07 - TT #4
L15 - Gypsum Transfer Tower & conveyors view from B01 - Boiler
E04 - Cooling Tower area view from C06 - Coal Conveyors
L24 - WFGD Ducts view from South-West side
L09 - WFGD Auxiliary Storage Tank area view from South side
K4 - Guard House civil work activities
Plant South side of Coal Bunker area view from B01 - Boiler
Plant South side of Boiler area view from B01 - Boiler
Plant South side of ECS area view from B01 - Boiler
Plant South side of WFGD area road work activities
Plant South side of Stack area road work activities
Acid Cleaning temporary collecting pond area view from B01 - Boiler