Project General view from South-West side 
Project view from South-West side 
Plant view from South-West side 
Plant North side area view from EGAT existing plant unit #13
B63 - STH view from South-East side
B63 - STH view from South-West side
B63 - STH North side sanitary pit civil work activities
B63 - STH turbine Feedwater Tank area view from East side
B63 - STH turbine area view from West side
B63 - STH MDFWP area view from +14.00 m level
B63 - STH loading bay area view from +14.00 m level
B64 - ST turbine area view from North-East side
B64 - Generator area view from South-West side
B64 - ST turbine view from North-West side
B64 - ST turbine view from North-East side
B64 - ST turbine view from North side
B64 - ST IP turbine valves view from West side
B64 - ST IP turbine valves view from South-East side
B64 - ST HP turbine valves view from East side
B64 - ST HP turbine valves view from West side
B64 - STH BFWP area view from South-East side
B64 - STH BFWP #1 view
B63 - STH Feedwater Tank view from North side
B63 - STH HP BIS Heaters insulation installation
B63 - STH HP Heaters view
B63 - STH LP Heaters view
B63 - STH BFWP lube oil flushing activities
Steam Blow pipe & silencer equipment temporary foundation demolition activities
B01 - Boiler view from South-East side
B06 - Boiler Coal Bunker view from North side
B06 - Boiler Coal Bunker view from South side
B07 - ESP 2 area view from South-East side
B07 - ESP 1 area view from North-East side
B07 - ESP 2 view from South side
B07 - ESP 2 outlet duct towards B10 - ID Fan B duct insulation activities
B95 - Condensate Polishing Plant view from South-East side
WFGD area view from South-East side
WFGD area view from North side
WFGD area view from East side
WFGD area view from South-West side
WFGD area view from North-West side
L04 - WFGD Pump Bldg. wall cladding installation
L05 - WFGD Absorber / Reactor Tower insulation & cladding installation
L06 - WFGD Electrical Bldg. view from South-West side
L07 - WFGD Service Bldg. tank area view
L07 - WFGD Service Bldg. gypsum storage foundation area view
L09 - WFGD Auxiliary Storage Tank area view from South side
L24 - WFGD Ducts view from South-East side
L24 - WFGD Seal Gas Fan pipe erection activities
L36 - WFGD SRS Bldg. area view from South-East side
L38 - WFGD Local Gypsum Slurry Tank pump area view
G11 - Boiler Fire Fighting Pump House area view from North-East side
G60 - Chemical Bulk Storage Bldg. civil work activities
B94 - Air Preheaters Washing Basin area view from South-East side
Ash Loading and Receiving station area view from EGAT existing plant unit #13
D01 - Fly Ash Silo Storage Tank view from North-East side
D23 - Ash Receiving Station view from South-West side
D08 - Ash Sub-Distribution Bldg. area view from South-East side
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C06 - Coal Conveyors view from North-East side
C06 - Coal Conveyors and Ash Loading & Receiving Station area view from EGAT existing plant unit #13
C07 - Transfer Tower #4 view from EGAT existing plant unit #13
L15 - Gypsum Transfer Tower structure erection activities
L15 - Gypsum Transfer Tower view from North-West side
G42 - Fire Fighting Pumping Station area view from South-West side
E04 - Cooling Tower area view from South-West side
Plant West side of Boiler Bunker area road work activities
Plant East side of STH area road work activities
Plant North side of Transformer area road work activities
Plant South side of WFGD area road work activities
Plant South side of Cooling Tower area drainage work activities
Plant East side of WFGD Service Bldg. area road work activities
Plant West side of Lignite Sub-Distribution Bldg. area drainage work activities
Plant East side of WFGD ducts area drainage work activities
Plant East side of Ash Loading Station area drainage work activities