25 May, 2018

25-05-18

Plant view from West side
B63 - STH view from West side
B63 - STH view from South-West side
B63 - STH view from South-East side
B06 - Boiler Coal Bunker pulverizer area view
B06 - Boiler Coal Bunker tripper deck conveyor belt line #7 testing activities
B30 - CEB Electrical Bldg. view from South-West side
B30 - CEB Electrical Bldg. main control room view
B30 - CEB Electrical Bldg. boiler furnace firing view
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
B07 - ESP view from B01 - Boiler
B07 - ESP #1 area view from B01 - Boiler
B07 - ESP #2 area view from B01 - Boiler
B95 - Condensate Polishing Plant area view
WFGD view from South-West side
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
G60 - Chemical Bulk Storage Bldg. area view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank view from B01 - Boiler
D06 - Ash Transfer Tower view from B01 - Boiler
D06 - Ash Transfer Tower wall cladding erection activities
C06 - Coal Conveyors and H03 - Piperack area view from B01 - Boiler
C06 - Coal Conveyors belt line #7 testing activities
C07 - Transfer Tower #4 area view from B01 - Boiler
Ash Receiving & Loading Station area view from B01 - Boiler
D23 - Ash Receiving Station and D30 - Ash Loading Station view from B01 - Boiler
Plant North side of Transformer area road work activities
Plant South side laydown area view from B01 - Boiler
Plant South side of STH area road work activities
Plant South side of Boiler area road work activities
Plant South side of ESP area road work activities