10 March, 2015

10.03.15

 BORING TP - B22


 INSTALLING CAGES ON TP - B23

MLT RIG 1 - BEING SET UP ON TEST PILE 

MLT RIG 2 - TEST COMPLETE TP - B18

 MLT RIG 2 - TEST COMPLETE TP - B18

 TEST PILE HEAD PREPARATION

TENSILE TEST ONGOING ON TP B16 

 TENSILE TEST ONGOING ON TP B16

  LIGNITE STRATA ON TP - B22


09 March, 2015

09.03.15

 SITE SITUATION TODAY

 TEST PILE PREPARATION


 TEST PILE PREPARATION

 MLT (COMPRESSION) TEST RIG 


CLIENTS BACK FILL CONTRACTOR IN LAYDOWN 

                                                   BATCHING PLANT FOUNDATIONS 

SITE PANO FROM THE SOUTH LOOKING NORTH OVER LAYDOWN AREA

06 March, 2015

06.03.15

 SITE SITUATION TODAY -VIEW FROM EAST

 ARRIVAL OF 20T HAMMER FOR DYNAMIC TEST ON PILES DIAM 1200mm

 PILE DYNAMIC TEST PDA ON TP-B01 1200mm DIAM

 PILE DYNAMIC TEST PDA ON TP-B03 1200mm DIAM

PILE DYNAMIC TEST PDA ON TP-B06 1200mm DIAM

 MAINTAINED LOAD TEST ON TP-B18 IN PROGRESS

 PREPARATION OF COUNTER WEIGHTS FOR MLT ON TP-B03

 PREPARATION WORK FOR AXIAL TENSILE LOAD TEST ON TP-B04

 CONCRETING OF THE LAST MC’S TEST PILE

CONSTRUCTION OF SITE BATCHING PLANT IN PROGRESS

05.03.15

 SITE SITUATION TODAY -VIEW FROM EAST

 ALSTOM MANAGEMENT SITE VISIT

 AXIAL TENSILE LOAD TEST ON TPB13 ONGOING

 TENSILE LOAD TEST ON TPB13 – HONEY BOX

 MAINTAINED LOAD TEST ON TPB15 IN PROGRESS

 TPB15 - HYDRAULIC  JACKS UNDER REACTION GIRDER

 PREPARATION WORK ON TPB18 FOR MAINTAINED LOAD TEST

PILING WORK FOR MC’S TEST PILES 

 FENCING AT SOUTH-WEST SIDE WILL BE CONTINUED AFTER LAND RECLAMATION

CONSTRUCTION OF SITE BATCHING PLANT BY CPAC ON GOING

03.03.15

SITE VIEW FROM SOUTH
   

 WEEKLY SAFETY INDUCTION CONTINUE REGULARLY EVERY TUESDAY

 PREPARATION WORK FOR AXIAL TENSILE LOAD TEST ON TPB13


 TPB15 READY FOR MAINTAINED LOAD TEST

 START OF MAINTAINED LOAD TEST ON PILE TPB15

 PREPARATION WORK FOR MAINTAINED LOAD TEST ON TPB18

 TPB18- PLACING HYDRAULIC  JACKS UNDER REACTION GIRDER

 PILING WORK FOR MC’S TEST PILES ONGOING

 FENCING AT SOUTH SIDE IN GOOD PROGRESS

PREPARATION OF AREA FOR CONSTRUCTION OF SITE BATCHING PLANT BY CPAC

04 March, 2015

02.03.15

GENERAL SITE VIEW

 SITE SITUATION TODAY

PREPARATION WORK FOR MAINTAINED LOAD TEST ON PILE TPB15

 
COUNTER WEIGHTS FOR TESTING OF PILE TPB15

 PREPARATION OF AREA FOR TESTS ON TP11 & TP12

 PILING WORK FOR MC’S TEST PILES AT EAST SIDE

 INSTALLATION OF SITE TEMPORARY FACILITIES AT SOUTH-EAST

 SITE PERIMETER FENCING AT SOUTH EAST SIDE COMPLETED

 FENCING AT SOUTH WEST SIDE IN PROGRESS

 SCAFFOLDING DELIVERY

 PREPARATION OF AREA FOR CONSTRUCTION OF SITE BATCHING PLANT BY CPAC