B63 AND B30 PILING IN PROGRESS
B01 BOILER ZONE A (SOUTH) FORMATION EXCAVATION IN PROGRESS (@-3.6 M)
B01 BOILER ZONE A (CENTER) FORMATION EXCAVATION IN PROGRESS (@-3.6 M)
B01 BOILER ZONE B (NORTH) FORMATION EXCAVATION STARTED
B01 BOILER ZONE A (NORTH) PILE CUTTING IN PROGRESS