24.08.15
PILING ACTIVITY AT POWER BLOCK AREA
BOILER ZONE A – VIEW FROM SOUTH
BOILER ZONE B (NORTH)– LEAN CONCRETE ON 22/08/15
REBAR PREFABRICATION AREA FOR FOUNDATIONS
REBAR PREFABRICATION AREA FOR PILING