Transformer Area and STH view from West
 Transformer Area, - CEB & STH view from South-West
 F05 - 230kV Swyr Substation view from South
F05 - 115kV Swyr Substation view from South
F05 - 230kV Swyr Substation view from North
 F05 - 115kV Swyr Substation view from South-West
B68 - SST Transformer Area view from West
 B68 - SST Transformer Area view from West
C01 - Fuel Oil tank erection 
 Oily - water Tank for transformer area installation
F05 - 115kV Swyr Substation view from South-East
 B63 - STH North side cladding erection works
 B30 - CEB External view from North
B63 - STH Cable trays erection works
B30 - CEB =4.00m LV Room view
B30 - CEB Cabling activities
B30 - CEB Cabling activities
 B30 - CEB Cabling activities
B30 - CEB Cabling activities
B33 - CEB Server Room control panels erection
F05 - 115kV Swyr Substation view from CEB
F05 - 230kV Swyr Substation view from CEB
B30 - CEB Battery Room view
 B68 - Main Transformers Area view from North-East
B35 - BEB Top view from Boiler temporary elevator
B63 - WSC piping works activities
B63 - WSC piping works activities
 B63 - WSC piping works activities
 B63 - STH & B95 Polishing Plant view from East
 B01 - Boiler Area 5 Steel structure Erection
B01 - Boiler Area 5 Steel structure Erection
B01 - Boiler Area 5 Steel structure Erection
B01 - Boiler Area 5 Steel structure Erection
 B01 - Boiler Area 5 Steel structure Erection
 B01 - Boiler South side FD Fan Erection
B01 - Boiler South side view
B07 - ESP view from South-West
B01 - Boiler South side PA Fan Erection
B07 - North side ESP Ash equipment erection
B07 - South side ESP support structure for Ash equipment erection
B01 - Boiler North side PA Fan Erection
 B01 - Boiler North-East side view
 B01 - Boiler North-East side view
B10 - North side Induced Draft Fan Erection
L05 - Absorber / reactor Tower erection
 L04 - WFGD Pump Bldg. view from South-East 
L24 - Flue Gas Ducts structure view from North-East
L06 - WFGD Electrical Bldg. Construction
L07 - WFGD Service Bldg. Construction
L06 - WFGD Electrical Bldg. Construction
L07 - WFGD Service Bldg. Construction
WFGD Area view from East
E12 - Cooling Tower Pumping Station - Pumps erection
L07 - WFGD Service Bldg. view from South
WFGD Area view from East
Boiler - ESP & Flue gas Ducts view from South-East
 Boiler - ESP- Flue gas Ducts  & Stack view from South-East