09 May, 2017

09-05-17

B68 - SST Transformer area bus bars erection
B30 - CEB External area - F.F. water deluge system
B30 - CEB External area North side view
B35 - BEB - H03 - Pipe Rack & B01 Boiler West side view 
B35 - BEB & B01 Boiler East side view
B35 - BEB view from Boiler 
B35 - BEB Cable trays erection from Pipe Rack 
 B63 - STH Loading Bay Civil construction activities
 B63 - STH Baby Turbines Civil construction activities
B63 - STH Lube Oil room view from +16.00m
 B63 - STH Main Condensate Pumps erection (Motors)
 B63 - STH Piping works activities
 B63 - STH Piping works activities
B63 - STH Piping works activities
B63 - STH Piping works activities
B95 - Condensate Polishing Plant  Civil construction activities
B95 - Condensate Polishing Plant Piping works activities
 B95 - Condensate Polishing Plant Construction
B95 - Condensate Polishing Plant Construction
B01 Boiler Area view from South-East
 B01 - Boiler Furnace Bottom Rear assembly activities
B01 - Boiler Furnace Bottom Rear assembly activities
B01 - Boiler Furnace Bottom Rear assembly activities
 B01 - Boiler Furnace Bottom Rear assembly activities
 B01 - Boiler hopper section assembly activities
B01 - Boiler Furnace Bottom Rear assembly activities
 B01 - Boiler ducts erection activities
B01 - Boiler FD Fan and PA Fan North side erection activities
B01 - Boiler pressure parts erection activities
 B01 - Boiler pressure parts erection activities
G21 - NH3 Storage Bldg. Steel structure erection
G21 - NH3 Storage Bldg. Steel structure erection
B10 - ID Fan South side view
B10 - ID Fan North side view
B02 - Stack view
L06 - WFGD Electrical Bldg. Civil construction activities
L06 - WFGD Electrical Bldg. Civil construction activities
 L06 - WFGD Electrical Bldg. Civil construction activities
L07 - WFGD Service Bldg. Steel structure erection
L07 - WFGD Service Bldg. Steel structure erection
L09 - WFGD Auxiliary Storage Tank Foundation 