B63 - STH area view from South-East side
B63 - STH area view from North-East side
B01 - Boiler area view from South-East side
B01 - Boiler North side PA & FD Fans area civil work activities
B01 - Boiler elevator structure wall cladding erection activities
B30 - CEB Electrical Bldg. area civil work activities
B07 - ESP view from B01 - Boiler
B07 - ESP #1 area view from B01 - Boiler
B07 - ESP #2 area view from B01 - Boiler
B89 - Compressed Gas Storage House area view from South-West side
WFGD area view from South-East side
WFGD area view from East side
WFGD area view from North side
L04 - WFGD Pump Bldg. area view from South-East side
L04 - WFGD Absorber / Reactor Tower view from B01 - Boiler
L06 - WFGD Electrical Bldg. view from South-West side
L07 - WFGD Service Bldg. view from East side
L07 - WFGD Service Bldg. view from West side
L07 - WFGD Service Bldg. gypsum storage area view
L09 - WFGD Auxiliary Storage Tank area view from South-West side
L24 - WFGD Ducts area view from South-East side
L36 - WFGD SRS Bldg. area view from South-East side
G60 - Chemical Bulk Storage Bldg. area view from B01 - Boiler
G60 - Chemical Bulk Storage Bldg. area view from West side
B94 - Air Preheater Washing Basin area view from South-East side
D01 - Fly Ash Silo and D06 - Ash Transfer tower area view from B01 - Boiler
D06 - Ash Transfer Tower area view from North-West side
C06 - Coal Conveyors and H03 - Piperack area view from B01 - Boiler
Ash Loading and Receiving Station area view from B01 - Boiler
D23 - Ash Receiving Station and D30 - Ash Loading Station area view from B01 - Boiler
D23 - Ash Receiving Station view from South-East side
D08 - Ash Sub-Distribution Bldg. area view from South-East side
C08 - Lignite Sub-Distribution Bldg. area view from South-West side
C07 - Transfer Tower #4 area view from B01 - Boiler
L15 - Gypsum Transfer Tower area view from East side
L15 - Gypsum Transfer Tower area view from B01 - Boiler
G42 - Fire Fighting Pump Station view from South-East side
E06 - Cooling Water Treatment Bldg. area view from South-West side
E07 - Cooling Water Electrical Bldg. area view from South-West side
Plant South side of STH area view
Plant South side of Boiler area view
Plant South side of ESP area view
Plant North-East side of STH area road work activities
Plant East side of Compressed Air Production area road work activities
Plant North side of WFGD Pump Bldg. area drainage work activities
Plant North side of Cooling Tower area civil work activities