Plant view from South-West side
B63 - STH area view from South-East side
B63 - STH area view from North-East side
B63 - STH loading bay view from 14.00 m level
B63 - STH turbine feedwater tank area view from North-East side
B63 - STH turbine area view from South-West side
B63 - STH elevator steel structure erection activities
B63 - STH elevator steel structure erection activities
B64 - ST powertrain view from West side
B64 - Generator view from South-East side
B63 - STH BFWP #2 view
B63 - STH BFWP area view from South side
B63 - STH BFWP area view from North side
B63 - STH BFWP #1 enclosure panel erection activities
B01 - Boiler area view from South-East side
B01 - Boiler North side PA & FD Fans area civil work activities
B01 - Boiler elevator structure wall cladding erection activities
B06 - Boiler Coal Bunker area view from North side
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
B30 - CEB Electrical Bldg. area civil work activities
B89 - Compressed Gas Storage House area view from South-East side
WFGD area view from South-East side
L04 - WFGD Pump Bldg. area view from South-East side
L06 - WFGD Electrical Bldg. view from North-West side
L06 - WFGD Electrical Bldg. view from South-West side
L07 - WFGD Service Bldg. view from West side
L07 - WFGD Service Bldg. gypsum product commissioning activities
L09 - WFGD Auxiliary Storage Tank area view from South-West side
L10 - WFGD Booster Fans area view from North-West side
L24 - WFGD Ducts area view from South-East side
L36 - WFGD SRS Bldg. area view from South-East side
G60 - Chemical Bulk Storage Bldg. area view from West side
B94 - Air Preheater Washing Basin civil work activities
D06 - Ash Transfer Tower area view from West side
D23 - Ash Receiving Station view from South-West side
D23 - Ash Receiving Station view from South-East side
D08 - Ash Sub-Distribution Bldg. area view from South-East side
G42 - Fire Fighting Pump Station view from South-East side
E04 - Cooling Tower area view from North-West side
E07 - Cooling Water Electrical Bldg. area view from South-West side
C07 - Transfer Tower #3 area view from South-West side
Plant North-East side of STH area drainage work activities
Plant North side of Boiler area road work activities
Plant North side of WFGD Pump Bldg. area drainage work activities
Plant North side of WFGD area road work activities