31 March, 2015
23.03.15
BATCHING PLANT UNIT 1 - INSTALLING WATER PIPING
UNIT 2 - INSTALLING LOADER RAMP
PILE HEAD & AREA PREPARATION FOR TP-B01 TESTING
ADDING BALLAST TO COMPRESSION TEST RIG ON TP-B05
COMPRESSION TEST CONTINUES ON TP-B06
COMPRESSION TEST CONTINUES ON TP-B08
TENSION TESTING ON TP-12 (MC)
CLIENT B/FILL CONTINUES ON SOUTH BOUNDARY OF MAIN SITE
22.03.15
BATCHING PLANT UNIT 1 ELECTRICAL & ADMIXTURE TANK INSTALLATION
BATCHING PLANT UNIT 1 INSTALLATION OF RAMP ON LOADER
CLIENT BACK FILL TO SOUTH BOUNDARY
LATERAL TESTING ON TP-B01 (BOILER)
SETTING UP COMPRESSION TESTING RING ON TP-B05
COMPRESSION TESTING ON TP-B06 CONTINUES
COMPRESSION TESTING ON TP-B08
INSTALLING THE TENSION RIG CONNECTIONS TO TP-12 (MC)