31 March, 2015

31.03.15

EXTENT OF BACK  FILL FOR LAYDOWNS VIEW EAST

EXTENT OF BACK FILL FOR LAYDOWNS VIEW WEST 

 EXTENT OF BACK FILL FOR LAY DOWNS VIEW NORTH


SITE BATCHING PLANTS PERMANENT POWER CONNECTION COMPLETE 


SITE BATCHING PLANTS PREPARING FOR FIRST TRIAL MIXES 


30.03.15



          TEST LOADING HOPPER & CONVEYORS              CONSTRUCTION OF BATCH PLANT WASTE PIT

 INSTALLATION OF BALANCE OF MAIN SITE PERIMETER FENCE ON NEWLY COMPLETED B/FILL

COMPRESSION TESTING (MLT) ON TP-B12 CONTINUES

PILE HEAD PREPARATION ON TP-B06











27.03.15

 BATCHING PLANT UNIT 1

BATCHING PLANT UNIT 2 

BATCHING PLANT UNIT 2 - SECONDARY MATERIAL BINS 


BATCHING PLANT UNIT 1 ELEVATION 

BATCHING PLANT UNIT 2 ELEVATION 

GENERAL SITE VIEW - EAST 

STRIKING MLT RIG FROM TP-B06 

GENERAL SITE VIEW WEST 

26.03.15

BATCHING PLANT UNIT 1 

                                                           BATCHING PLANT UNIT 2  


TP-B05 COMPRESSION (MLT) TESTING CONTINUES 

MLT RIG AT TP-B06 READY TO RELOCATE

 TENSILE TESTING OF TP-09 (MC)

NO B/FILL ACTIVITIES DUE TO HEAVY RAIN

25.03.15

 BATCHING PLANT UNIT 1 - CABLING 

BATCHING PLANT UNIT 2 - MATERIAL BIN CONSTRUCTION

 PILE HEAD PREPARATION ON TP-B03

COMPRESSION TESTING ON TP-B05 CONTINUES

                           COMPRESSION TEST ON TP-B08 COMPLETE - WAITING FOR STRIKE                                              
DYNAMIC TESTING ON TP-10 (MC)
 
                                      CLIENT B/FILL ON SOUTHERN BOUNDARY CONTINUES.                                                                                     

24.03.15

BATCHING PLANT UNIT 1 - WIRING CONTROL ROOM 

 BATCHING PLANT UNIT 2 - PREPARING GROUND SLABS

 CLIENT B/FILL CONTINUES ON SOUTH BOUNDARY 

 TENSION TESTING ON TP-12 (MC) 

                           INSTALLING TESTING RING ON TP-B03                                        

 COMPRESSION TEST ON TP-B05 CONTINUES 

DYNAMIC TESTING ON TP-B17 

23.03.15

 BATCHING PLANT UNIT 1 - INSTALLING WATER PIPING
                             UNIT 2 -  INSTALLING LOADER RAMP

 PILE HEAD & AREA PREPARATION FOR TP-B01 TESTING

ADDING BALLAST TO COMPRESSION TEST RIG ON TP-B05 

                       COMPRESSION TEST CONTINUES ON TP-B06                                  

COMPRESSION TEST CONTINUES ON TP-B08 

TENSION TESTING ON TP-12 (MC)

CLIENT B/FILL CONTINUES ON SOUTH BOUNDARY OF MAIN SITE

22.03.15

BATCHING PLANT UNIT 1 ELECTRICAL & ADMIXTURE TANK INSTALLATION


BATCHING PLANT UNIT 1 INSTALLATION OF RAMP ON LOADER

CLIENT BACK FILL TO SOUTH BOUNDARY 

LATERAL TESTING ON TP-B01 (BOILER) 

SETTING UP COMPRESSION TESTING RING ON TP-B05 

COMPRESSION TESTING ON TP-B06 CONTINUES 

COMPRESSION TESTING ON TP-B08 


INSTALLING THE TENSION RIG CONNECTIONS TO TP-12 (MC)