31 March, 2015

22.03.15

BATCHING PLANT UNIT 1 ELECTRICAL & ADMIXTURE TANK INSTALLATION


BATCHING PLANT UNIT 1 INSTALLATION OF RAMP ON LOADER

CLIENT BACK FILL TO SOUTH BOUNDARY 

LATERAL TESTING ON TP-B01 (BOILER) 

SETTING UP COMPRESSION TESTING RING ON TP-B05 

COMPRESSION TESTING ON TP-B06 CONTINUES 

COMPRESSION TESTING ON TP-B08 


INSTALLING THE TENSION RIG CONNECTIONS TO TP-12 (MC)