BATCHING PLANT UNIT 1 ELECTRICAL & ADMIXTURE TANK INSTALLATION
BATCHING PLANT UNIT 1 INSTALLATION OF RAMP ON LOADER
CLIENT BACK FILL TO SOUTH BOUNDARY
LATERAL TESTING ON TP-B01 (BOILER)
SETTING UP COMPRESSION TESTING RING ON TP-B05
COMPRESSION TESTING ON TP-B06 CONTINUES
COMPRESSION TESTING ON TP-B08
INSTALLING THE TENSION RIG CONNECTIONS TO TP-12 (MC)