09 November, 2015

09.11.15


ARRIVAL OF BOILER STRUCTURAL STEEL SECTIONS 



OFFLOADING OF BOILER STRUCTURAL STEEL SECTIONS IN LAYDOWN AREA


ARRIVAL OF BOILER STRUCTURAL STEEL SECTIONS IN PROGRESS
  

PRAYER CEREMONY IN LAYDOWN AREA


CONTINUATION OF B64 SHEET PILING


PREPARATION FOR B64 PILE TESTING (PILECAPS)


PRE CONCRETING INSPECTION FOR PILECAP B1 PEDESTALS (SECONDARY)


PRE CONCRETING INSPECTION FOR PILECAP B1 PEDESTALS (SECONDARY)



PRE CONCRETING INSPECTION FOR PILECAP B1 PEDESTALS (SECONDARY)


No comments:

Post a Comment