31 October, 2017

31-10-17

B30 - CEB Electrical Bldg. view from South-West side
B30 - CEB Electrical Bldg. Programming room console installation activities
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. washroom view
B30 - CEB Electrical Bldg. balcony Elev. 16.00 m view
B68 - Transformer area South side underground civil work activities
F05 - 230 kV Switchyard area view from B30 - CEB Electrical Bldg.
B07 - ESP area view from South-East side
WFGD area view from East side
WFGD area view from South-East side
L09 - WFGD Auxiliary Storage Tank view from East side
L07 - WFGD Service Bldg view from East side
L36 - SRS Bldg. roof sheeting activities
L07 - WFGD Service and L36 - SRS Bldg. view from South-East side
L24 - WFGD Ducts view from South side
L06 - WFGD Electrical Bldg. cable pulling activities
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
C03 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C06 - Coal Conveyors structure pre-assembly area view
C07 - Coal Transfer Tower structure erection activities
C07 - Coal Transfer Tower structure erection activities
C08 - Lignite Sub-Distribution Bldg. area view from South-West side
G42 - Fire Fighting Pumping Station area view from E04 - Cooling Tower
G42 - Fire Fighting Pumping Station area view from South-East side
G33 - Used Water Reservoir Tank area view from E04 - Cooling Tower
G06 - Demin Effluents Neutralization Bldg. view from E04 - Cooling Tower
E12 - Cooling Tower Pumping Station view from E04 - Cooling Tower
E07 - Cooling Water Electrical Bldg. area view from North-East side

30 October, 2017

30-10-17

B63 - STH view from West side
B64 -BFWP 1 Oil Skid equipment view
B64 -BFWP 1 Oil pipe erection activities
B64 -BFWP 1 Oil pipe erection activities
B64 -BFWP 2 Oil skid equipment view
B64 -BFWP 2 Oil pipe erection activities
B63 - STH - WSC piping erection work activities
B63 - STH - WSC piping erection work activities
B35 - BEB Electrical Bldg. South side staircase structure erection activities
B68 - Transformer area South side underground civil work activities
B01 - Boiler Slug Conveyor foundation civil work activities
B01 - Boiler Submerged Conveyor concrete slab work activities
B01 - Boiler Submerged Conveyor concrete slab work activities
C01 - Fuel Oil Storage Tank area view from South-West side
C01 - Fuel Oil Storage Tank F.F. pipe installation activities
D01 - Fly Ash Silo Storage Tank and D09 - Weighing Bridge area view from North-East side
D06 - Fly Ash Slug Conveyor structure erection activities
 D06 - Fly Ash Slug Conveyor structure erection activities
D01 - Fly Ash Silo Storage Tank steel plate assembly area
D01 - Fly Ash Silo Storage Tank area view from East side
D23 - Ash Receiving Station foundation area view
D30 - Ash Loading Station foundation area view
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
H03 - Piperack towards B07 - ESP structure erection activities
Auxiliary Steam piperack crossing view
Auxiliary Steam piperack crossing from existing EGAT plant view