B63 - STH area view from North-West side
B63 - STH area view from West side
B63 - STH area view from South-West side
B63 - STH area view from South-East side
B63 - STH view from West side
B64 - Power train view from North-West side
B64 - Generator view from South-East side
B63 - STH - WSC piping erection work activities
B63 - STH - WSC piping erection work activities
B30 - CEB Electrical Bldg. view from South-West side
B35 - BEB Electrical Bldg. view from South-West side
B35 - BEB Electrical Bldg. South side staircase structure erection activities
B35 - BEB Electrical Bldg. rooftop view from B01 - Boiler
B35 - BEB Electrical Bldg. panels wiring work activities
B35 - BEB Electrical Bldg. panels area view
B35 - BEB Electrical Bldg. panels wiring work activities
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure view from B01 - Boiler
B17 - Flue Gas Ducts pre-assembly area view from B01 - Boiler
B89 - Comp. Gas Storage Bldg. view from South-West side
B95 - CPP Bldg. view from South-East side
B95 - CPP Bldg. view from South-West side
B95 - CPP Bldg. area West side underground civil work activities
B68 - Transformer area South side underground civil work activities
F05 - 230 kV Switchyard area view from B01 - Boiler
B01 - Boiler South FD Fan and PA Fan view
B01 - Boiler North side FD Fan and PA Fan view
B06 - Boiler Bunker Station area view from South side
B01 - Boiler Cavity area civil work activities
B01 - Boiler Submerged Conveyor foundation civil work activities
B01 - Boiler Submerged Conveyor foundation civil work activities
B01 - Boiler Slug Conveyor foundation civil work activities
B01 - Boiler North side Temporary Tower crane foundation demolition activities 
B01 - Boiler North side area view from B35 - BEB Electrical Bldg.
B01 - Boiler Soot-Blower erection activities
B01 - Boiler ducts lagging pins welding activities
B01 - Boiler ducts lagging installation activities
B01 - Boiler ducts lagging & cladding installation activities
B01 - Boiler Bunker Bay conveyor area view
B07 - ESP view from North-West side
B07 - ESP view from B01 - Boiler
B07 - ESP view from South-West side
B07 - ESP view from South-East side
B07 - ESP view from North-East side
B07 - ESP 1 view from B01 - Boiler
B10 - South ID Fan B area view
WFGD, ESP and Coal Conveyor area overview from Top B01 - Boiler
WFGD North-West side view from Top B01 - Boiler
WFGD South-West side view from Top B01 - Boiler
WFGD area view from North side
WFGD Tank area view from L07 - Service Bldg.
WFGD area view from L07 - Service Bldg.
L04 - WFGD Pumping Station Bldg. view from North-East side
L04 - WFGD Pumping Station Bldg. rooftop view from B01 - Boiler
L05 - WFGD Absorber / Reactor view from L07 - Service Bldg. 
L05 - WFGD Absorber / Reactor view from B01 - Boiler
L06 - WFGD Electrical Bldg. and H02 - Cable rack area view from West side
L06 - WFGD Electrical Bldg. view from L07 - Service Bldg.
L06 - WFGD Electrical Bldg. rooftop grating installation activities
L06 - WFGD Electrical Bldg. rooftop view from B01 - Boiler
L07 - WFGD Service Bldg. Vacuum pump installation activities
L07 - WFGD Service Bldg. conveyor installation activities
L07 - WFGD Service Bldg. conveyor structure installation activities
L09 - WFGD Auxiliary Storage Tank roof installation activities
L24 - WFGD Ducts view from L07 - Service bldg.
L24 - WFGD Ducts view from South-West side
C01 - Fuel Oil Storage Tank area view from West side
C01 - Fuel Oil Storage Tank and Auxiliary piperack structure area view from B01 -Boiler
D01 - Fly Ash Silo Storage Tank and D09 - Weighing Bridge area view from North-East side
D01 - Fly Ash Silo Storage Tank and H03 - Piperack area view from B01 - Boiler
D23 - Ash Receiving Station foundation area view
D30 - Ash Loading Station foundation area view
D08 - Fly Ash Sub-Distribution Bldg. internal view
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
G42 - Fire Fighting Pumping Station and H03 - Piperack view from L07 - WFGD Service Bldg.
E04 - Cooling Tower view from L07 - WFGD Service Bldg.
C06 - Coal Conveyors and H03 - Piperack view from Top B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from Top B01 - Boiler
C06 - Coal Conveyors from L07 - WFGD Service Bldg.
C06 - Coal Conveyors module pre-assembly area view from B01 - Boiler
C06 - Coal Conveyors structure and D20 - Fly Ash Comp. Air Bldg. area view from East side
C06 - Coal Conveyors structure and D08 - Fly Ash Sub-Distributiuon Bldg. area view from West side
C06 - Coal Conveyors structure pre-assembly area view
H03 - Piperack structure erection activities
H03 - Piperack structure erection activities
H03 - Piperack structure view from B01 - Boiler
H03 - Piperack towards B07 - ESP structure erection activities
C07 - Coal Transfer Tower structure view from B01 - Boiler
HV Cable Trench from F05 - 230 kV Switchyard support for cable pulling activities
Temporary Hydro-test drain water collecting pond area view from Boiler