10 October, 2017

10-10-17

B63 - STH area view from West side
B63 - STH area view from South-West side
B63 - STH South side wall cladding erection activities
B63 - STH and B95 - CPP piping view from Elev. +14.00 m
B63 - STH Loading bay ground floor slab civil activities
B64 - Power train area view from North side
B64 - BFPT piping erection activities
B63 - STH area Elev. +14.00 m view from West side
B64 - BFWP Motor view from Top (Elev. +14.00 m)
B64 - Power Oil room view from Top (Elev. +14.00 m)
B64 - Lube oil flushing activities
B64 - Lube oil flushing activities
B64 - BFPT auxiliary equipment installation activities
B64 - ST LP-IP Coupling honing activities
B01 - Boiler Submerged Conveyor foundation civil work activities
B01 - Boiler Submerged Conveyor foundation civil work activities
B01 - Boiler Submerged Conveyor foundation civil work activities
B01 - Boiler FD Fan area civil work activities
 B01 - Boiler Ducts insulation activities
B02 - Stack elevator rail alignment activities
 B30 -CEB Electrical Bldg. Programming room view
 B30 - CEB Electrical Bldg. Main Control room view
 B30 - CEB Electrical Bldg. staircase erection activities
 B35 - BEB Electrical Bldg. Aux. Transformer view from North side
B35 - BEB Electrical Bldg. panels internal area view
 B35 - BEB Electrical Bldg. panels wiring activities
 F05 - 230kV Switchyard area view from C30 - CEB Bldg.
 L05 - WFGD Absorber / Reactor elbow view from North-West side
G10 - Emergency Diesel Generator area view from C30 - CEB Electrical Bldg.
C01 - Fuel Oil Storage Tank and C03 - Fuel Oil Pump Station area view from North
C01 - Fuel Oil Storage Tank view from C30 - CEB Electrical Bldg.
C01 - Fuel Oil Storage Tank pipe erection activities
C03 - Fuel Oil Pump Station pipe erection activities
G08 - Compressor Air Bldg. wall cladding erection activities
 D23 - Ash Receiving Station pipe crossing area view
 D30 - Ash Loading Station foundation area view
D30 - Ash Loading Station foundation area view
 D06 - Ash Transfer Tower structure erection activities
Auxiliary Steam pipe crossing area view 
Auxiliary Steam pipe support foundation civil works activities
HV Cable Trench from F05 - 230kV Switchyard support installation activities