30 October, 2017

30-10-17

B63 - STH view from West side
B64 -BFWP 1 Oil Skid equipment view
B64 -BFWP 1 Oil pipe erection activities
B64 -BFWP 1 Oil pipe erection activities
B64 -BFWP 2 Oil skid equipment view
B64 -BFWP 2 Oil pipe erection activities
B63 - STH - WSC piping erection work activities
B63 - STH - WSC piping erection work activities
B35 - BEB Electrical Bldg. South side staircase structure erection activities
B68 - Transformer area South side underground civil work activities
B01 - Boiler Slug Conveyor foundation civil work activities
B01 - Boiler Submerged Conveyor concrete slab work activities
B01 - Boiler Submerged Conveyor concrete slab work activities
C01 - Fuel Oil Storage Tank area view from South-West side
C01 - Fuel Oil Storage Tank F.F. pipe installation activities
D01 - Fly Ash Silo Storage Tank and D09 - Weighing Bridge area view from North-East side
D06 - Fly Ash Slug Conveyor structure erection activities
 D06 - Fly Ash Slug Conveyor structure erection activities
D01 - Fly Ash Silo Storage Tank steel plate assembly area
D01 - Fly Ash Silo Storage Tank area view from East side
D23 - Ash Receiving Station foundation area view
D30 - Ash Loading Station foundation area view
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
H03 - Piperack towards B07 - ESP structure erection activities
Auxiliary Steam piperack crossing view
Auxiliary Steam piperack crossing from existing EGAT plant view