B63 - STH area view from South-East side
B63 - STH North side wall cladding erection activities
B63 - STH - WSC piping work erection activities
B06 - Boiler Bunker Station area view from North side
B01 - Boiler Submerged Conveyor foundation back-filling activities
B01 - Boiler ground floor civil work activities
B35 - BEB Electrical Bldg. South side structure erection activities
B35 - BEB Electrical Bldg. cable pulling activities
B35 - BEB Electrical Bldg. cable pulling activities
B07 - ESP area view from South-West side
B07 - ESP area view from North side
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
B10 - North ID Fan A view
B10 - North ID Fan A cable termination activities
B94 - Air Heater Wash Pond foundation area view
B94 - Air Heater Wash Pond foundation area view
WFGD area view from North-East side
WFGD area view from North side
WFGD area view from North-West side
WFGD area view from East side
L04 - WFGD Pump Bldg. area view from North-East side
L04 - WFGD Pump Bldg. area view from West side
L06 - WFGD Electrical Bldg. area view from North-West side
L06 - WFGD Electrical Bldg. and H02 - Cable rack area view from West side
L07 - WFGD Service Bldg. area view from East side
L07 - WFGD Service Bldg. area view from North-East side
L09 - WFGD Auxiliary Storage Tank area view from East side
L36 - SRS Bldg. area view from East side
L36 - WFGD SRS and L07 - Service Bldg. area view from E04 - Cooling Tower
WFGD area view from E04 - Cooling Tower
L07 - WFGD Service Bldg. ground floor area view
L07 - WFGD Service Bldg. Tank area view
C01 - Fuel Oil Storage Tank fire fighting pipe erection activities
C03 - Fuel Oil Pump Station area view from North side
Auxiliary Steam pipe structure erection activities
Auxiliary Steam pipe crossing structure area view
G08 - Compressor Air Bldg. and C07 - Coal Transfer Tower area view from East side
D01 - Fly Ash Silo structure area view from West side
D01 - Fly Ash Silo structure and D09 - Weighing Bridge area view from North-East side
D30 - Ash Loading Station foundation area view
D30 - Ash Loading Station foundation area view
D23 - Ash Receiving Station pipe crossing area view
D08 - Fly Ash Sub-Distribution Bldg. area view from South-East side
D20 - Fly Ash Comp. Air Bldg. West side wall cladding activities
C08 - Lignite Sub-Distribution Bldg. area view from South-West side
C08 - Lignite Sub-Distribution Bldg. panels installation activities
C08 - Lignite Sub-Distribution Bldg. internal area view
G42 - Fire Fighting Pumping Station area view from E04 - Cooling Tower
G42 - Fire Fighting Pumping Station area view from South-East side
G42 - Fire Fighting Pumping Station area view from South-West side
G33 - Used Water Reservoir Tank area view from E04 - Cooling Tower
G06 - Demin Effluents Neutralization Bldg. view from E04 - Cooling Tower
E06 - Cooling Water Treatment Bldg. area civil work activities
E06 - Cooling Water Treatment Bldg. equipment
E06 - Cooling Water Treatment Bldg. equipment
E06 - Cooling Water Treatment Bldg. equipment
E07 - Cooling Water Electrical Bldg. area view from North-East side
E12 - Cooling Tower Pumping Station view from E04 - Cooling Tower
C06 - Coal Conveyor structure and D08 - Fly Ash Sub-Distribution Bldg. area view from East side
C06 - Coal Conveyor structure and D20 - Fly Ash Comp. Air Bldg. area view from East side
C06 - Coal Conveyor structure pre-assembly view
C06 - Coal Conveyor structure pre-assembly view
C06 - Coal Conveyor structure area view from C08 - Lignite Sub-Distribution Bldg.
C06 - Coal Conveyor structure view
C06 - Coal Conveyor structure view
C07 - Coal Transfer Tower structure pre-assembly view
C07 - Coal Transfer Tower structure erection activities
C07 - Coal Transfer Tower structure erection activities
H03 - Piperack structure erection activities
H03 - Piperack structure erection activities
H03 - Piperack area underground cable ducts civil work activities
B68 - Transformer area South side underground civil work activities
B63 - STH North side wall cladding erection activities
B63 - STH - WSC piping work erection activities
B01 - Boiler and B07 - ESP area view from North-East side
B06 - Boiler Bunker Station area view from South sideB06 - Boiler Bunker Station area view from North side
B01 - Boiler Submerged Conveyor foundation back-filling activities
B01 - Boiler ground floor civil work activities
B35 - BEB Electrical Bldg. South side structure erection activities
B35 - BEB Electrical Bldg. cable pulling activities
B35 - BEB Electrical Bldg. cable pulling activities
B07 - ESP area view from South-West side
B07 - ESP area view from North side
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
B10 - North ID Fan A view
B10 - North ID Fan A cable termination activities
B94 - Air Heater Wash Pond foundation area view
B94 - Air Heater Wash Pond foundation area view
WFGD area view from North-East side
WFGD area view from North side
WFGD area view from North-West side
WFGD area view from East side
L04 - WFGD Pump Bldg. area view from North-East side
L04 - WFGD Pump Bldg. area view from West side
L06 - WFGD Electrical Bldg. area view from North-West side
L06 - WFGD Electrical Bldg. and H02 - Cable rack area view from West side
L07 - WFGD Service Bldg. area view from East side
L07 - WFGD Service Bldg. area view from North-East side
L09 - WFGD Auxiliary Storage Tank area view from East side
L36 - SRS Bldg. area view from East side
L36 - WFGD SRS and L07 - Service Bldg. area view from E04 - Cooling Tower
WFGD area view from E04 - Cooling Tower
L07 - WFGD Service Bldg. ground floor area view
L07 - WFGD Service Bldg. Tank area view
C01 - Fuel Oil Storage Tank fire fighting pipe erection activities
C03 - Fuel Oil Pump Station area view from North side
Auxiliary Steam pipe structure erection activities
Auxiliary Steam pipe crossing structure area view
G08 - Compressor Air Bldg. and C07 - Coal Transfer Tower area view from East side
D01 - Fly Ash Silo structure area view from West side
D01 - Fly Ash Silo structure and D09 - Weighing Bridge area view from North-East side
D30 - Ash Loading Station foundation area view
D30 - Ash Loading Station foundation area view
D23 - Ash Receiving Station pipe crossing area view
D08 - Fly Ash Sub-Distribution Bldg. area view from South-East side
D20 - Fly Ash Comp. Air Bldg. West side wall cladding activities
C08 - Lignite Sub-Distribution Bldg. area view from South-West side
C08 - Lignite Sub-Distribution Bldg. panels installation activities
C08 - Lignite Sub-Distribution Bldg. internal area view
G42 - Fire Fighting Pumping Station area view from E04 - Cooling Tower
G42 - Fire Fighting Pumping Station area view from South-East side
G42 - Fire Fighting Pumping Station area view from South-West side
G33 - Used Water Reservoir Tank area view from E04 - Cooling Tower
G06 - Demin Effluents Neutralization Bldg. view from E04 - Cooling Tower
E06 - Cooling Water Treatment Bldg. area civil work activities
E06 - Cooling Water Treatment Bldg. equipment
E06 - Cooling Water Treatment Bldg. equipment
E06 - Cooling Water Treatment Bldg. equipment
E07 - Cooling Water Electrical Bldg. area view from North-East side
E12 - Cooling Tower Pumping Station view from E04 - Cooling Tower
C06 - Coal Conveyor structure and D08 - Fly Ash Sub-Distribution Bldg. area view from East side
C06 - Coal Conveyor structure and D20 - Fly Ash Comp. Air Bldg. area view from East side
C06 - Coal Conveyor structure pre-assembly view
C06 - Coal Conveyor structure pre-assembly view
C06 - Coal Conveyor structure area view from C08 - Lignite Sub-Distribution Bldg.
C06 - Coal Conveyor structure view
C06 - Coal Conveyor structure view
C07 - Coal Transfer Tower structure pre-assembly view
C07 - Coal Transfer Tower structure erection activities
C07 - Coal Transfer Tower structure erection activities
H03 - Piperack structure erection activities
H03 - Piperack structure erection activities
H03 - Piperack area underground cable ducts civil work activities
B68 - Transformer area South side underground civil work activities