09 April, 2015

09.03.15




MLT TESTING OF TP-B23 CONTINUES 

ASSEMBLY OF MLT RIG ON TP-B22 

                                                   ASSEMBLY OF MLT RIG ON TP-B22  

                                                   ASSEMBLY OF MLT RIG ON TP-B22 

 B01 BOILER "SHORT" REBAR CAGE FABRICATION STARTED 

BAUER RE-MOBILISE TO TEST EQUIPMENT 
                                                   PENDING BOILER PILE RFC RELEASE

INSTALLATION OF TSF 

                                            INSTALLATION OF CLIENT CEREMONIAL AREA