29 April, 2015

29.04.15

 BAUER PILE REBAR PREFABRICATION YARD

MLT COMPRESSION TESTING RIG SET UP ON STH TP-B17  

 SECOND BAUER PILING RIG ASSEMBLED & UNDER TESTING (BG25)

CASTING BOILER ZONE C PILES 

2ND BAUER PILING RIG INSTALLING AUGER HEAD ON MAST (BG25) 

BAUER BG24 (1ST RIG) DRY BORING BOILER ZONE C PILES 