29 May, 2015

29.05.15

GENERAL VIEW FROM NW- REBAR PRE-FABRICATION YARD

PRE-FABRICATION OF BOILER REBAR CAGES

APS SITE OFFICE CONSTRUCTION IN PROGRESS

APS SITE OFFICE - POWER FLOATING OF GROUND SLAB 

MC SITE OFFICE CONSTRUCTION

EGAT SITE OFFICE CONSTRUCTION

28 May, 2015

28.05.15

NOTE: VERY HEAVY RAIN & THUNDER STORM 
FROM 1800 HRS 27/05 TO 0500 HRS 28/05 
- HENCE THE SITE CONDITIONS WERE VERY DIFFICULT TODAY

SITE VIEW OF BOILER PILING TO THE EAST 

SITE VIEW OF BOILER PILING TO THE WEST 

PILING & SURVEY CONTROL STATION (VIEW EAST) 

PANO - BOILER PILING FROM EAST 

PRE-FABRICATED BOILER ZONE B REBAR CAGES 

INSTALLING BOILER ZONE B REBAR CAGE 

CASTING BOILER ZONE B PILE 

GENERAL VIEW OF SITE CLEAN UP FOLLOWING 
VERY HEAVY RAIN STORM OVER NIGHT

27 May, 2015

27.05.15

 GENERAL SITE VIEW FROM SOUTH EAST

BORING BOILER ZONE A PILE

BORING BOILER ZONE B PILE

INSTALLING PILE REBAR CAGE IN BOILER ZONE B 

CASTING BOILER ZONE A PILE





26.05.16

 GENERAL SITE VIEW FROM SOUTH ACROSS B01 BOILER

GENERAL SITE VIEW FROM EAST  

BAUER PREFABRICATION YARD RELOCATED TO EAST OF SITE 

BORED PILING BOILER ZONE C 

BORED PILING BOILER ZONE B 

CASTING BORED PILE BOILER ZONE B 

CASTING BORED PILE BOILER ZONE B 

EXTENT OF CLIENT EARTHWORKS IN LAYDOWN AREA 3

25 May, 2015

25.05.15

GENERAL VIEW - BOILER PILING WORKS

STEEL PLATES LAID FOR EASING THE MOVEMENT AT SITE

BORING PILE IN BOILER ZONE A

INSTALLING PILE REBAR CAGE BOILER ZONE A

CASTING PILE BOILER ZONE A

APS OFFICE FOUNDATION WORK 
REINFORCEMENT PLACING FOR GROUND SLAB

22 May, 2015

22.05.15

SITE GENERAL VIEW 

PILING WORKS AT BOILER AREA

BORING IN BOILER ZONE B

INSTALLING PILE REBAR CAGE ZONE B

CASTING PILE USING POLYMER BOILER ZONE A 

MC, BAUER & NWRT SUPERVISORS RECORDING PILE BORING DATA

SURVEYOR TEAM 

21 May, 2015

21.05.15

GENERAL VIEW BOILER PILING WORKS

BORING IN BOILER ZONE A

INSTALLING PILE REBAR CAGE IN BOILER ZONE B

PILE REBAR CAGE AND TREMIE PIPE IN PLACE PRIOR CASTING


CASTING OF BOILER ZONE A PILE

SITE TEMPORARY ROAD & DRAINAGE WORKS IN PROGRESS

NEW WORK PLATFORM FOR PILE REBAR CAGES FABRICATION

RECLAMATION FOR LAY DOWN AREA IN PROGRESS 

20 May, 2015

20.05.15

GENERAL VIEW BOILER PILING WORKS

BORING IN BOILER ZONE A

INSTALLING PILE REBAR CAGE ZONE B

CASTING PILE BOILER ZONE B

BOILER PILE REBAR CAGES FABRICATION

SITE TEMPORARY ROADS IN PROGRESS