NOTE: VERY HEAVY RAIN & THUNDER STORM
FROM 1800 HRS 27/05 TO 0500 HRS 28/05
- HENCE THE SITE CONDITIONS WERE VERY DIFFICULT TODAY
SITE VIEW OF BOILER PILING TO THE EAST
SITE VIEW OF BOILER PILING TO THE WEST
PILING & SURVEY CONTROL STATION (VIEW EAST)
PANO - BOILER PILING FROM EAST
PRE-FABRICATED BOILER ZONE B REBAR CAGES
INSTALLING BOILER ZONE B REBAR CAGE
CASTING BOILER ZONE B PILE
GENERAL VIEW OF SITE CLEAN UP FOLLOWING
VERY HEAVY RAIN STORM OVER NIGHT