28 June, 2016

28.06.16

Panoramic View to South
Boiler view to South
Boiler pressure part installation
Boiler Backpass Pressure part support steel 
Boiler Furnace Main girders 
Boiler Air Ducts South  
Boiler Air Ducts North
LB Steam Piping installation 
Air Heater View to East 
Site View to South - STH / CEB 
B63 STH View to South
B30 CEV & F05 SY Area View to South 
H03 Pipe Rack and B35 CEB View to South 
ECS Area - WFGD & ESP Foundations View to South East 
CW Pipes View to East  
Overall Site View to East 
B07 - ESP Foundations View to East  
Laydown area 3 - Ductworks and pressure parts ground fabrication
 B94 STG Foundation view to West
 B94 STG Foundation view to West

25 June, 2016

25.06.16


Boiler view over mills bay
 Boiler furnace main girders upper view
Boiler furnace main girders lower view 
  Boiler backpass pressure part support structure
Boiler Coal Piping 
Air Preheater
RAPH & Ductworks View to East 
Boiler Ductworks View to South
Boiler Ductworks View to South 
LB Piping installation commenced 
Boiler Pressure part ground fabrication area 
Boiler ductwork ground fabrication area (Laydown Area 3)
 Boiler ductwork ground fabrication area (Laydown Area 1)
Overview t East Laydown area 3
 PA & FD Fan foundation North
PA & FD Fan foundation South
B95 Polishing Plant foundations view to East 
B63 STH View to North 
B63 STH and B64 STG View to South  
 B63 STH and B64 STG View to North 
B64 STG View to West 
Transformers (B68) and SwitchYard (F05) Area view to West 
Electrical Network Transformers (B68)
Electrical Network Transformers (B68) - SwitchYard (F05)
B68 SST Transformer foundation view to South West 
 B30 CEB View to West
B35 BEB View to North East - all pile caps poured 
  H03 Pipe Rack View to North East
 CW pipe View to East - last trust block on the North/East edge poured
 B07 ESP View to East
WFGD Area View to East
Site View to East
Underground Tanks Area L60 / E10 / G40 
E04 Cooling Tower View to East