27 February, 2015

26.02.15

 SITE SITUATION TODAY

 AXIAL TENSILE LOAD TEST ON TP02

 DYNAMIC LOAD TESTING (PDA) ON PILE TP011

 DYNAMIC LOAD TESTING (PDA) ON PILE TP018

 GAUGES ATTACHMENT ON THE PILE

 PILE DRIVING ANALYZER - TP018

 PILING WORK FOR MC’S TEST PILES ONGOING

 CABLE INSTALLATION FOR POWER SUPPLY TO TEMPORARY SITE FACILITIES

 FENCING AT SOUTH SIDE IN PROGRESS

LAND RECLAMATION BY EGAT

No comments:

Post a Comment